Xinjiang carried out pilot work for small and micro enterprises hazardous waste collection

Author:Tianshan.com Time:2022.07.19

Tianshan News (Reporter Li Xing report) Recently, the Ecological Environment Department of the Autonomous Region issued the "Pilot Work Plan (Trial)" in the Autonomous Region Small and Micro -Enterprise Harbor Collection (Trial). A comprehensive hazardous waste centralized collection system.

The pilot work is to solve the difficulty of collecting difficulties in the collection of small and micro enterprises and social source hazardous waste. The application for the establishment of no more than 3 pilot units in the industrial parks. No more than two, encourage industrial parks, small and micro enterprises, and social hazardous waste to produce pilots based on the centralized industrial parks, small and micro enterprises, and social source hazardous waste. Informal hazardous waste storage places are involved in the pilot.

On July 16, the Changji Hui Autonomous Prefecture Ecological and Environment Bureau strengthened the supervision and inspection of medical waste safety disposal to ensure that the medical waste Nissan was clear. Zhu Ya Photo

At the same time, a small and micro enterprise with a total amount of more than 10 tons of dangerous waste (except medical waste) annually generates less than 10 tons of total amount, and uses institutions, scientific research institutes, schools, various testing institutions, motor vehicle maintenance institutions and other units and social sources. The focus of the focus; the annual production -producing units with a amount of more than 10 tons, the small amount of waste mineral oil, waste container and container, laboratory waste, online monitoring waste liquid, waste fluorescent lamp tube, waste activated charcoal, etc., can be included in the collection range Essence

After the pilot unit is reviewed and determined, the hazardous waste collection license will be obtained in accordance with the law, strictly implemented the requirements of the standardized environmental management management requirements of hazardous waste, and transferred the hazardous wastes collected in accordance with relevant regulations to the disposal of the hazardous waste use in Xinjiang. It is reported that the total scale of the pilot unit collects not more than 5,000 tons/year.

The plan pointed out that if there is a fake behavior in the process of pilot declaration and information reporting, the pilot work fails to carry out the pilot work in accordance with the pilot requirements, and the occurrence of major environmental pollution during the pilot period, it will be dealt with in accordance with laws and regulations.

The relevant person in charge of the Solid waste and chemicals of the Ecological Environment Department of the Autonomous Region said that by carrying out pilot work, the environmental supervision and services of dangerous wastes in small and micro enterprises will be further strengthened to effectively open up the "last mile" of small and micro enterprises to collect "last mile", improve and improve and improve Improve the centralized collection system of hazardous waste, and make up for the shortcomings of the centralized collection and disposal of hazardous waste to ensure the safety of the ecological environment.

- END -

Admissions to the stolen 2 million, the surname of the hidden surname is 20 years, the ending is the recovery of the French Open | 9:30 tonight

In 2003, 26 -year -old Li WeiIt is a savings at a branch of China Merchants Bank B...

Garbage dump transformation into ecological park

In the summer, Baoqing County Donghu Park's water waves and fragrant grass, the gr...