Jinan's official "Raiders": The new house is delivered to this acceptance!

Author:Love Jinan Client Time:2022.07.20

Buying a house is a big deal. From the choice of the house to the delivery, every link is crucial, especially the acceptance after getting the key, which is related to the quality of living in the future. But most owners do n’t know how to check the house inspection? What need to pay attention to? For this reason, the Jinan Housing and Urban -Rural Development Bureau have compiled an official “strategy” for the owner's reference.

Before the house inspection, the industry mainly scanned the two -dimensional code of the households publicized in the household, understood the acceptance of the house, and verified the authenticity. When the households have not objections, the inspection test officially begins.

For the acceptance of the rough house, the owner should pay attention to the following aspects:

1. Get entrance door

See: Whether the entrance door is installed with square, the frame fan is deformed, whether there are bumps, damage, and obvious scratches on the surface; listening: whether the switch is smooth and noisy, whether the door fan is loose, check whether the door lock is firmly installed; open: the door fan: the door fan: the door fan The opening angle requires ≥90 degrees.

2. The ground, wall

Check whether there are obvious cracks, the area of ​​each empty drum is not more than 400 cm, and there are not more than 2 places between each naturally; pay attention to whether there are obvious peeling, potholes, sand and other defects on the ground. , Defect with peeling.

3. Donald

Whether the surface layer is flat, the line angle is straight, there is no obvious scratch, and there are no quality problems such as drums, cracking, and pollution.

4. Room size

Room measurement is the focus of acceptance. Between each nature, 2 points are measured at the open room and depth of the room at 0.2 meters from the wall. The center point was measured at 5 points. The measurement room was net high. The maximum measurement value and the minimum measured value were not more than 20 mm.

5. Window

(1) Whether the outer window installation is square, firm, whether the opening is flexible, whether there are abnormal noise loosen, whether the closing is tightly closed, whether the window frame profile is deformed, and the surface is polluted; (2) whether the hollow glass is installed firmly, is there any? Cracks, damage, whether the inside and outside surface is clean and non -stains, and whether there is dust and water vapor in the hollow layer; (3) Whether the screens are installed firmly and without damage; (4) Whether there is no leakage or seepage around the outer window; (5) Whether the water leakage holes outside the doors and windows are blocked, there are no debris in the window frame, and the sealing of the doors and windows is firm, complete, and straight.

6. indoor waterproof

In accordance with the requirements of the municipal housing and construction department, before the owner's house inspection, the construction unit needs to prepare for the water leakage of the water -related room and the root of the pipe roots. Leakage; in addition, whether the drainage and drainage pipes of the ground leakage and drainage pipes are smooth through irrigation.

7. Indoor Electric

Check whether the installation of the power distribution box, the switch socket, the indoor lamps, an equal potential box, and the indoor weak electric box are installed square and firm, whether the leakage protection switch is sensitive and effective, and whether the lamp is lit normally.

8. indoor water heating

(1) The heating system should be delivered with pressure, and the pressure is not less than 0.4MPa. Check whether there is leakage of the pipeline; the interface of the water device shall not leak or fixed; according to the design requirements The corresponding loop logo is made in functional rooms; the radiator should be fixed, the grounding line is complete, and the connection should be reliable; (2) the water supply system pipeline, valve and silk block should not leak or penetrate. Later decoration use; (3) The living room and bedroom ground are identified as the heating pipe area, water supply pipeline area, and marked the flow of water (except the floor heating project); Give the water point, the shower hot and cold water gives the water point, reserve the toilet drainage port, wash the facial washing pot drainage port, and identify the cold and hot water. Make functional logo.

9. Others

Other contents and parts that need to be checked, and the owner can check according to the drawing of the drawings and the relevant quality acceptance specifications and standards.

In addition to the above content, the owners who accept the full renovation house also need to pay attention:

1. Whether the settings of the household security system (intercom) are complete and use it normally.

2. Whether the indoor doors are installed with square, firmness, whether the surface of the frame fan is not bumpy, no pollution and obvious scratches, and the gaps in the frame fan are uniform; whether the door suction is firmly installed, the switch is normal, the hardware is complete without rust, and the back door fan is closed. No loose abnormal noise.

3. Whether the ground materials such as tiles are flat and clean, and whether the color is basically the same, whether there are cracks, corners, scratches, warps, etc. The corners are allowed to be empty drums, but each naturally does not exceed 5%of the total; there is no time drum on the skirting board, whether the height and the thickness of the convex wall are the same, and the upper mouth is straight; whether the slope of the floor drain is straight, and whether the drainage is unobstructed without water.

4. The wooden floor paving should be firm, non -loose, there is no abnormality on walking, and there is no obvious gray on the ground; the pattern is clear, the color is uniform, no cracks, scratching, warpan, burrs and other quality defects; The seams are tight, and the installation height is consistent with the thickness of the convex wall.

5. The coating is uniform, without leakage, bottoming, powder drop, leakage and other defects.

6. The surface of the block of the kitchen and bathroom is flat, clean, and uniform in color.

7. Wallpaper wall cloth is observed at 1.5 meters from the wall, stitching horizontal and vertical, patterns and patterns at the joints are in line with defects such as tilted edges, bubbles, cracks, folds, etc. Uniform, no pollution, strabismus without rubber marks, and the seams are not obvious.

8. The sanitary ware is fixed and firm, and the drainage of the toilet and the wash basin is smooth and the use of the toilet is normal.The relevant professional issues raised during the inspection of the owner shall answer the relevant professionals of the construction unit based on the specifications, standards and design drawings.The rectification of the time limit is complete, and the problem rectification situation can be delivered after being signed and confirmed by the owner.

- END -

In the newly -crowned patients in France, the seventh wave of epidemic increased by nearly 20% in one week or reached its peak

Overseas Network, July 17th. According to Agence France -Presse, data from the French Public Health Agency shows that the number of newly -crown hospitalized patients in France has increased by nearly

Lufeng Municipal Meteorological Bureau lifted lightning yellow warning [III class/larger]

The Lufeng Meteorological Bureau was lifted at 21:10 on June 08, 2022 to lift the lightning yellow warning released by 13: 12:33 on June 08, 2022.