State Grid Zouping City Power Supply Company: Special Tour of the "Flood Control" Safe Wall after the rain

Author:Zou Ping Rong Media Time:2022.07.20

"There is no stagnant water in the cable ditch and the equipment is running normally." Recently. State Grid Zouping Power Supply Company organized staff to conduct special patrols after the rain 110 kV Lange Station, closely pay close attention to the operation of the equipment, and fully ensure the safe and stable operation of the power grid during the flood during the flood.

Recently, Zou Ping's continuous heavy rainfall weather has brought challenges to the operation of the equipment. In order to cope with bad weather and ensure the safe operation of the equipment, the State Grid Zouping Power Supply Company pays close attention to the weather changes, and adjusts the operation of the power grid in real time. After the rain, organize the staff to prevent the waterproof baffle, cable ditch, outdoor terminal box and other equipment in the area under the jurisdiction. Perform comprehensive inspections, do not intermittent temperature measurement on each connection point, and record data. Focus on checking whether the cable trench can be drained in time in time, and it is found that there are clogging places to deal with hidden dangers in time. At the same time, the power supply company also strengthened the intensity of the line channels and the intensity of the line channels and tower tower lines in the jurisdiction, focusing on the inspection of the tower foundation that washed after the rain, reinforced the tower base soil, and ensured the safety of the line to the greatest extent. Strengthen emergency management, implement the relevant duty system, and implement the "four in place" of equipment, materials, vehicles, and personnel in advance to ensure that they can be dispatched immediately after the accident, and hidden dangers are eliminated in a short time.

Correspondent Jiao Zhulin

- END -

Let love zero distance, affection "visible"

Dahe News reporter Li Ping Correspondent Wang Jing Liang Ruwen mapMom, I'm good at...

Zhengzhou Railway Adjustment Some Train Train Plan

July 20thAccording to the characteristics of passenger flow in the current tubeChi...