China Resources Electric Power Northern Henan New Energy Company: Forced functional supervision, building a "dam" during the flood season

Author:Henan Daily Client Time:2022.07.23

In accordance with the deployment of the TV conference on the national flood prevention and drought resistance work, always adhere to the concept of "people's supremacy first". China Resources Power Northern Henan New Energy Company before the flood season, plan ahead, plan in advance, and carry out multi -frequency and stubble flood prevention projects throughout the company. Supervision and inspection, comprehensively suppress the responsibility of flood prevention work, consolidate the results of flood prevention, and ensure safety production.

Prevent and early warning in time. Before the flood season, China Resources Electric Power Holdings, China and Western District, and Northern Henan New Energy Company's party committees deployed in advance to put forward specific requirements for the key points of the flood prevention. Flood prevention emergency plans and flood prevention materials reserve for inspection and exercise to ensure the effectiveness and execution of the plan. After receiving the warning of extreme weather at all levels of provinces and cities, various projects and wind farms were notified in time, and deployment was arranged in a timely manner according to the warning content and early warning level to achieve a plan for ahead, and to meet the test of nature with serious and solid preparations.

Leaders at all levels went deep into the scene and conducted forward command. Focus on a comprehensive inspection and inventory of the "one -one -one strategy" natural disaster emergency training, emergency drill, flood control materials reserve, etc., and can be called in time when the flood conditions occur; comprehensively check the hidden dangers of safety and control, and to build buildings and outdoor equipment and facilities Inspection, especially outdoor power protection to prevent personal damage and equipment accidents, and ensure safety of floods; to carry out safety inspections on key places such as fans, boosting stations, sending lines, and collecting lines. Reject various hidden dangers and dangers in time to prevent the tower broken lines and water flooding equipment.

Project monitoring and responding in time. During the flooding process, timely observation and analysis of the rivers, embankments, and flood prevention projects near the fan equipment and booster stations, etc., can be analyzed and analyzed in a timely manner in order to determine the situation in a timely manner and take effective measures to ensure the safety of the project. The inspection content mainly includes the situation of building sliding, displacement, sinking, cracks, and foundation leakage.

In the process of extreme weather, timely contact with local governments and keep communication with unobstructed communication. When the danger appears, actively cooperates with local governments to build a "safe wall" of flood prevention. On July 5th, China Resources Anyang Wind Power Farm received an urgent notice of the Armed Forces Department of Lucun Town, and reinforcements needed to speed up the rescue work of the river embankment. The Anyang Wind Power Farm immediately responded to the requirements of the superior party committee and government. Together with the local masses, they block the rivers and dykes to ensure the safety of the lives and property of the people.

After the disaster, it was not relaxed and the flood prevention supervision was normal. In response to the recent continuous rainfall, each wind field uses the morning meeting time, clarifies the flood prevention tasks on the day of flood prevention, and conducts various supervision and inspection in the flood in an orderly manner. At the same time, focus on supervision and strengthen inspections, report danger in time, pay close attention to weather changes, realize the hidden dangers of geological disasters in the jurisdiction in real time, and comprehensively implement the responsibility for flood prevention.

In the future, China Resources Electric Northern Henan New Energy Company will continue to give full play to the role of functional supervision, timely changes in real time according to the weather, fully cope with the safety hazards caused by extreme weather, do a good job of various flood prevention and disaster reduction work, and continuously improve the people of various stations to emergen. Comprehensive processing capabilities and linked coordination capabilities, build safety defense lines during the flood period, ensure that personal equipment is safe and controlled, so that the integration of major supervision and business is deeply practical. At the same time, the company will continue to actively respond to the needs of higher -level party committees and local governments, devote themselves to the performance and practice of social responsibility, and contribute China Resources forces to the people's needs.

- END -

Wuhan's latest personnel appointment and removal

On the morning of June 24th, the third meeting of the 15th Standing Committee of t...

Sports Tide Play Card | Science and Technology Equipment Blessing, Bringing anchor to challenge senior players