Jinping District has taken multiple measures and promoted the construction of sponge cities to achieve preliminary results

Author:Shantou released Time:2022.07.25

In the heat and heat, the rainy garden in Taoyuan Community, Jindong Street, Jinping District, is lush, cool and comfortable, and is "big with a lot".结合海绵城市理念改造后,这片土地就像会自由畅快地“呼吸”一样,雨水汇入雨水花园,通过渗透、吸收、净化、回收,发挥削峰作用,提高排水能力,减少道路径流污染和The rainysts are straight, and the original old communities are rejuvenating.

In June last year, the city was successfully selected as the "First Batch of Sponge Demonstration City in the country". Jinping District adopted a variety of measures to promote the construction of sponge cities, gradually resolved urban waterlogging, improved the urban ecological environment, improved the ability of disaster prevention and mitigation in cities. A sense of happiness and security. At present, more than 40 sponge projects are promoted in the area, covering a variety of types of municipal roads, residential communities, public buildings, green spaces, urban water systems, drainage pumping stations, etc., realizing the strategy of "+sponge" to "sponge+" construction strategy The transition is initially realized that the entire process of sponge projects is controlled and promoted by the whole area.

Under the scorching sun, the construction staff were busy excavating the road and buried underground drainage pipes on the interval road. In order to eliminate the historical waterlogging point in the 11 cities and villages in the east of Meixi, at the end of April this year, Jinping District launched the first bid for construction in the southern film of Jinhu Road in Jinping District and the area management road drainage channel. All construction tasks.

The project manager Wu Huanhui introduced that the transformation project was mainly to solve the historical problem of more than 70,000 people in the area. Through the upgrading and transformation of road drainage channels, improve the ability of low -lying points, solve the problem of waterlogging and water accumulation in low -lying pipes, improve the effectiveness of the entire pipe network, gradually realize the diversion of regional rainfall, and improve the standards and quality of regional drainage facilities.

It is understood that in accordance with the construction of projects such as municipal roads, housing buildings, park green spaces, residential communities, etc., Jinping District has strengthened the construction and control of projects in the region in accordance with the "Administrative Measures for the Construction of Sponge City Planning and Construction of Shantou City". With sponge construction as the lead, the implementation of the comprehensive urban governance and improvement has been implemented, and the construction of sponge cities has changed from "end" governance to "source reduction, process control, and system governance". +Engineering measures "fusion transformation.

As the old city of our city, Jinping District introduced the concept of sponge cities according to local conditions to achieve the improvement of rainwater control capabilities of old communities, as well as the overall improvement of the community environment. The use of Taoyuan Residential Community has been used for nearly 30 years. The facilities are aging and the green land rate is low. The community is basically rain and stains, and the pipeline is severely damaged. In the renovation of the old community, the project rebuilt the sewage pipe network system of the community to achieve rainfall diversion. At the same time, combined with the concept of sponge city construction, the hard paving between the buildings of the building building was changed to the water -transmitting pavement. Ecological parking spaces set up rainwater gardens at the center of the center of the community to reduce the elevation of the green space, remove the original road stones, and remit the nearby roadside running water into the rainwater garden.

According to Huang Chuxuan, the staff of the Jinping District Housing and Urban Construction Bureau, after the implementation of the project, the appearance of the community has been renewed, the green land rate of the park has greatly improved, the total annual runoff control power of the key areas reached 77%, the control rate of the annual net profit of the road reached 42%. One of the "model" cases of sponge transformation in the old community.

"Through a series of measures, the sponge construction work in Jinping District has begun to achieve results." Lu Zehui, deputy director of the Jinting District Housing and Urban Construction Bureau, said that since the construction of the sponge city construction, the Jinping District Government attaches great importance to it, and Not only did the project planning and planning first, solved the problems of rainwater space, emissions and roads, realized the natural cycle of urban rainwater, but also vigorously promoted the construction of waterlogging improvement projects, focusing on the construction of old communities with prominent shortcomings. Transform the underground pipe network infrastructure. After the coordinated efforts of many departments, some results have been achieved in solving urban waterlogging and improving the living environment. The rectification of some areas is immediate and has been well received by the public.

(Source: Shantou Daily)

- END -

Guizhou in the new era | Du Fujia: "Angel" leader in the village, the "salesman"

In June last year, Du Fujia became the first secretary of Shatang Village in Meita...

"Red Xiangshan Cultural Experience Center" Patriotic Education Base unveiled

Xiangshan Street/PictureOn June 28, the Red Xiangshan Cultural Experience Center, ...