Weifang Bus has been opened for 2 new openings, 2 adjustments, and a new night site is added

Author:Weifang Media Network Official Time:2022.06.08

Weifang Public Transport Group opened two bus lines 166 and 167

In order to implement the practical activity of \"I do practical things for the masses\", practice the purpose of the people's service service Building the people's satisfaction bus, starting from June 8th, Weifang Bus Group has opened two bus lines of 166 and 167. At this point, the total number of lines affiliated to Weifang Public Transport Group has reached 155. The specific opening situation is as follows:

166 bus lines from Fushan Forest Park, via Weinhan Road-Fuyan Mountain Road (formerly West Ring Road)-Dongfeng Street- Qingping Road-Yuqing Street to the Terminal Station Lutai Convention and Exhibition Center; set up 26 stations on the upward line, 26 stations in the downlink line; the first class of Fushan Forest Park 6:30, the last class 18:00; : 30. The last class is 18:00 (the first day of the first day of the opening ceremony is departed after the opening ceremony).

167 bus lines from the Fushan Forest Park, via Weinhan Road-Fuyan Mountain Road (formerly West Ring Road) -Fuyuan Street-Limin Road- Weichang Road-Changsong Road-Shengli Street-Qingping Road-Yuqing Street to Terminal Station Luotai Convention and Exhibition Center; 28 stations on the upward line, 29 stations on the downlink line; 6:30 in the first class of Fushan Forest Park, last The class is 18:00; the first class of the Lutai Convention and Exhibition Center is 6:30, and the last class is 18:00 (the first day of the first day of the line is departed after the opening ceremony).

After the above two lines are opened, the first three days after the opening of the opening of the free ride policy. In the next step, with the changes in passenger flow along the way, the departure time of the first and last class will be appropriately adjusted, and operating vehicles will be gradually increased, operating flights, shortening interval, and further convenience for the people along the way.

Weifang Public Transport Group temporarily adjusted the local direction of the 166 and 167 parts

Affected by the closed construction of Qingping Road in Dongfeng Street. From June 8th, Weifang Public Transport Group will be affected by affected by the affected Two bus routes of Route 166 and 167 are temporarily adjusted. The specific adjustment scheme is as follows:

166 direction: the vehicle departs from the Fusan Mountain Forest Park, runs along the original line to the intersection of Dongfeng Street, Dongfeng Street, and restores the original along Changsong Road-Fushou Street-Qingping Road-Qingping Road. The route operation (vice versa of the downward direction), no longer runs Dongfeng Street (Changsong Road to Qingping Road), Qingping Road (Dongfeng Street to Fushou Street) section.

On the 167, the direction: the vehicle departs from the Fushan Forest Park, runs along the original route to the intersection of Qingping Road, Shengli Street, and follows the intersection of Qingping Road, Anshun Road to Anshun Road, along the north of Qingping Road. Rest -resume the original route operation (vice versa of the downward direction), and no longer runs the section of Qingping Road (Shengli Street to Fushou Street).

Due to inconvenience caused by temporary adjustment, please forgive me! After the intersection is completed and opened to traffic, the original line operation is restored. For details, please consult 5151100.

Weifang Public Transport Group increased the 112 -Low Night Bus Line and stopped at a station

In order to facilitate the travel of the people along the way, from June 6, the Weifang Public Transport Group's 112 Night Bus Line at the direction of Sunshine Ronghe HospitalIncrease a bus on the north side of the \"Sakuraqian Street Yongchun Road Road West\" on the north side of Sakura Street.

Please inform the large number of passengers to ensure smooth travel. For details, please consult 5151100.

- END -

The truth!Why did Tesla, BYD, Xiaopeng grabbing the beach here?

Recently, Cheng De, Secretary of the Party Working Committee of the Longyang Stree...

Beijing yesterday added 3 new diagnosis of the soil

From 0:00 on June 22 to 24:00, three new cases of confirmed cases in Beijing were added, and there were no new suspected cases and asymptomatic infections; 1 new case of input confirmed cases and 1 as