Ministry of Water Conservancy: Do your best to do a good job of precision flood forecast

Author:Guangming Daily Time:2022.07.26

Our newspaper, Beijing, July 25 (Reporter Chen Chen) The Ministry of Water Resources held a special chamber of commerce on the 25th to analyze and judge the key period of the flood prevention period of rain and water love and drought, and arrange the deployment of water and drought disaster defense work. Li Guoying, deputy commander of the National Defense General Defense and Minister of Water Resources, emphasized that it is necessary to resolutely tree awareness of the critical period of flood prevention, do a good job of prevention of water and drought disasters, and make every effort to accurately flood forecasts. In the process, strengthen the reporting report. According to the preliminary flood disaster situation, check whether the rainwater situation monitoring site is set to meet the defense requirements, and rolled the "rainfall -production flow -exchange -evolution" model to continuously improve the level of forecasting.

At present, my country is in a critical period of flood prevention in the "seven or eight". It is predicted that the main rainyst is located in the southwest of the southwest of the southwest, the eastern part of the southwest, Huanghuai, North China, the northeast, the eastern Jianghuai, and the northeast of the Jiangnan. The rivers of rivers in the watersheds of Yizheng, Haihe, Songliao, and Songliao will rise. The small and medium -sized rivers in the heavy rain areas may occur over super -police floods, and the super -police section of the river section of the Liaohe River will continue; staged drought in the middle and lower reaches of the Yangtze River.

Li Guoying requested that for the Yellow River Sanhua range and intensive silt dampery areas that may rain in the near future, the Haihe River Basin rejected the Malaysia River, Beiyi Shui, Zhongyi Shui, Waterfall and Luo River, Ji Canal, Bei River, Liao River, Liao River, Liao River In the key basin, formulate and improve the local heavy rain flood defense plan in advance, make a good preparation for flood control projects such as river and embankment, reservoir, flood storage area, etc., refine the measures of mountain flood disaster defense and silt dams, and implement the relevant watershed management institutions The defense responsibility of local water administrative departments and engineering management units. It is necessary to do a good job of drought resistance in key areas in advance, grasp the scope of the dry area and the subject of drought, and make targeted drought -resistant deployments to ensure the safety of drinking water in the masses, ensure the safety of livestock drinking water, and the demand for irrigation water for local crops. It is necessary to coordinate the scheduling of the amount of water in the river, and to judge the risk of cyanobacteria outbreaks in advance, calculate the amount of water, water level and flow, accurately control the process of water adjustment, water transmission and drainage process, and Taihu water level, effectively prevent and control the water ecology, water resources, and water environmental risks of the basin Essence It is necessary to fully do a good job of flood prevention in the central line of the South -to -North Water Diversion, implement the responsibility for flood control of related river lengths, pre -preset rescue teams and materials in advance, strengthen rescue organizations and technical support to ensure safety floods. It is necessary to seize the situation of heavy rainfall in the early stage, check the leakage in time, revise and improve the flood and flood disaster defense system of small and medium -sized rivers, and effectively ensure the safety of the people's lives and property.

- END -

[Party building leads to the "Five Governance Integration"] "Code" helps to "run immediately" -while Pingchuan District Pingchuan District Pingchuan District

Our reporter Yang Tao correspondent Chen YanniRecently, Chang Zhaoliang, Secretary of Qinchuan Community, Xingping Road Street, Pingchuan District, Baiyin City, received the resident in the background

The first meeting of the Leading Group for Special Rectification of Zhanjiang Self -Construction Housing Safety Safety Rectification Work was held

On July 19, the first meeting of the Leading Group for Special Rectification of Zhanjiang Self -Construction Housing Safety was held. Zeng Jinze, the leader of the mayor of the mayor and the leading g