Look, Hefei's "tropical fish" is about to transform gorgeously

Author:Hefei Daily Time:2022.07.31

On July 26, the expansion project T2 terminal of Hefei Xinqiao International Airport Terminal T2 and the special fire design plan and research results of the transportation center project was approved by the full vote review of experts, which laid the full construction of the main project of the terminal area of ​​the terminal. Base.

It is reported that the review meeting was held at the construction headquarters of the Xingqiao International Airport Terminal of Hefei. At the meeting, the construction unit introduced the project overview and promotion, and the design unit and technical consulting unit reported on fire design and special fire design reports.

During the review stage, the national fire review expert as the leader of the expert group, leading the well -known domestic fire design experts, invited experts invited by Hefei Fire Detachment, a team of fire review experts in various professional fields in the province, and the design units and technology The special fire design schemes and research reports provided by the service agency conducted detailed review, inquiries and discussions. After 10 hours of review, the project design plan and research results finally passed the expert review.

It is understood that the review meeting was also transferred from the fire design review and acceptance from the fire department to the housing construction department. The projects organized by the housing construction department were the largest and most complex special fire design expert review meeting. Hefei Xinqiao International Airport Terminal Expansion Project T2 Terminal T2 Terminal and Transportation Center project special fire design expert review successfully passed the successful approval, which sounded the horn of the construction of the main project of the terminal of the terminal of the terminal during the year.

The expansion project of Hefei Xinqiao International Airport Terminal is a iconic building collected by the international plan and determined by the provincial and municipal government. Among them, about 350,000 square meters of new T2 terminal T2. The design is divided into a main building and five finger corridors. The terminal of the terminal and the front of the front of the building (GTC) integrated design, combined with the new six urban railway and rail S1 lines to achieve air -rail transportation functions. At present, T2 Terminal's earthwork balance, foundation pit support, and affiliated projects are steadily promoting. T2 terminal design drawings are being modified and improved, and the GTC project earthwork and foundation pit support project have been publicly bidd.


Text | Zhuang Lu Quan Media Reporter Huang Ziyan

Edit | All media editor Wu Hong

Produced | "Lakeside Point" Rong Media Studio, "Shanshan is not late" Rong Media Studio

- END -

Yangjiabu Tourism Development Zone has taken a good job in doing a good job of drowning.

In order to effectively prevent drowning accidents in young and children, and effe...

Qingdao City has steadily promoted the construction of soil pollution prevention and control zone

Popular Network · Poster Journalist Wei Xinyu Correspondent Wang Nuo Cui Zhaohao ...