The dialysis of the special class is here, and the dialysis patients in Chenghua Management Control Area are finally relieved!
Author:Cover news Time:2022.08.01

Cover reporter Zhou Jiayi
Since 0:00 on July 29, 2022, Chengdu Chenghua District has implemented a comprehensive strengthening of social control and tentative implementation for 5 days. As soon as the news came out, the medical staff of the Sichuan Provincial People's Hospital's hemodialysis center immediately became alert: Many of the hundreds of hemodialysis patients in the center lived in Chenghua District! What about their dialysis treatment?
For patients with sexual dialysis, hemodialysis is the most important measure to maintain life and must not stop! On the evening of the 29th, Li Guisen, director of the Department of Nephrology of the People's Hospital of Sichuan Province, urgently held a section online meeting to study the treatment of patient dialysis patients living in Chenghua District, and decided to open a special class dialysis from the need for treatment and reducing risk consideration. The head nurse of the dialysis center immediately organized more than 10 nurses to check all outpatient dialysis patients in the background of the dialysis software system and verified them one by one.
After more than 10 hours of hard work, there were 4 people who lived in the seal -controlled area in the patient who were treated in the hospital for dialysis, and 19 were in the management control area (all of them were green codes). Four people in the sealing area have been arranged by the community for a designated hospital dialysis. The dialysis center decided on the morning of July 31 to open a special class dialysis for the remaining 19 patients with control areas.

For difficulties and risks that may face, according to the "Notice on the Requirements on Personnel in the Chengdu Management and Control Area" according to the hospital's new crown pneumonia. The patient's life is safe, to prevent the risk of infection, and strive to lose all.
Medical staff of the dialysis center actively asked for overtime, and quickly formed an excellent dialysis treatment team. At 7 am on Sunday, July 31, overtime caregivers began to prepare. At 7:45, the organizational patient queuing in an orderly queue to check the health code, the results of the nucleic acid report the previous day, body temperature, measurement of acid, weighing, and consultation. At 8 o'clock, the treatment starts on time. Everything is arranged.

At 12:30, all the patients ended the treatment smoothly and left in an orderly manner. Doctors and nurses have told: must go home directly to ensure two o'clock one line. At 13:30, the machine and the environment have been strictly disinfected in accordance with the requirements of the new crown pneumonia.
Looking at the quiet dialysis hall on Sunday, the medical staff who worked overtime were relieved. Although the only day of rest every day was gone, the life safety of the dialysis was guaranteed. Intersection
- END -
The flood in Beichuan, Sichuan caused 6 people to die, 12 people lost contact and transferred to the crowd of 1323 people
Cover Journalist Wang Xianglong Leader Leng YuAccording to the Propaganda Department of the Beichuan County Party Committee, from 20:00 on July 15th to 8:00 on the 16th, there was a heavy rainfall wea
Emergency report in the early morning: found 39 positives!Wuxi requires "non -necessary non -leaving tin"; Anhui has added 34+101, everyone here is not enough to leave home
According to the website of the National Health and Health Commission, at 0-24 on ...