The main project of Chiwan Parking Line 12 is completed, and Shenzhen's largest subway parking lot is about to be completed

Author:Shenzhen Evening News Time:2022.08.01

Recently, the construction of the Shenzhen Metro was reported. The reporter was informed that the main project of Chiwan Parking Line, the largest -scale parking lot under construction in Shenzhen Metro, has been completed, and will be put into operation simultaneously with Shenzhen Metro Line 12 at the end of the year. Since the parking lot on October 31, 2018, since the first time in Chiwan, the "Kaishan Cannon" has passed through more than 1,300 days and nights. The "mirror concrete" jointly created by the Shenzhen Metro Group and the construction unit China Electricity Construction. The number of later decoration projects.

According to reports, the Chiwan parking lot of Shenzhen Metro Line 12 is close to Shenzhen's second largest freight terminal Shekou Terminal. It is the supporting project of Shenzhen Metro Line 12 and the largest subway parking lot currently under construction in Shenzhen. After completion, it will undertake the parking, inspection, cleaning, and March March inspection of some vehicles 12. The parking lot is 1050 meters long, the widest is 370 meters, the narrowest point is 90 meters, and the total area is 24.1 hectares, which is equivalent to the size of the 34 football field.

There are about 1221 columns in the Chiwan parking lot, nearly 100,000 square meters of beams, and 328,000 cubic meters of concrete. Faced with the large concrete pouring volume, the Shenzhen Metro and China Electricity Construction "Mirror Concrete" jointly created from the coordination ratio of the concrete raw materials, construction plan, warehouse design, steel bars, standardized large templates, process control to process control to to Subsequent concrete temperature control and cracking and maintenance, each link is strictly controlled. The mirror concrete conforms to the concept of green development, which greatly reduces the number of later decoration projects and has been widely praised by the industry.

At the same time, Shenzhen Metro Group and China Electric Power Construction in the Chiwan Parking Lot actively promoted the deep integration of a new generation of construction information technology and project production. The two parties established the "Smart Site Information Center" in the Chiwan Parking Lot, which made full use of the Internet, the Internet of Things, cloud computing and big data. All elements such as the ring are allocated and managed to achieve digitalization, refinement, and intelligence of on -site management.

Metro Line 12 is a subway line that supports the development of western Shenzhen. The total length of the line is about 40.6 kilometers, and the entire line is set up on the entire line; there are 33 stations, including 18 transfer stations, which can be called the western "transfer king". This line starts from the left turret station of Nanshan District, and after wearing the central area of ​​Vietnam, Baoan Center, Fiyong District, Dakong Port and Exhibition Area from south to north, it finally goes to the East Station of Baoan District. Up to now, the main project of the Chiwan parking lot has been completed 100%, the field projects have completed 100%, the upper -lined development ramp has been completed by 87%, and the comprehensive building is installed and decorated with 92%, and the overall progress is rapid.

Shenzhen Evening News reporter Dong Yuhan

- END -

The Department of Culture and Tourism Resource Development Department came to the hospital for investigation

On August 2nd, Wang Heyun, a first -level inspector of the Department of Resources...

Xinjiang's "Background Too Fake Brother": Jiangsu guys came to Xinjiang to help farmers, and they were injured by hundreds of times by bees.

Jimu Journalist Xiao Mingyuan Xie MaoVideo editing Li Xiaoxue