Complete to be new!The largest subway parking lot in Shenzhen can stop 40 subways

Author:Shenzhen released Time:2022.08.02

The reporter learned yesterday that the main project of the largest parking lot of Shenzhen Metro was under construction, Line 12, the main project of Chiwan Parking Lot, Line 12, and it will be completed at the end of the year with Shenzhen Metro Line 12.

After more than 1,300 day and night construction, Shenzhen's largest subway parking lot, the main project of the Chiwan parking lot in Line 12, will be completed, and will be put into operation simultaneously with Metro Line 12 at the end of this year. Photo by Liu Yujie, Wu Jinwei

Shenzhen Metro Line 12 Chiwan Parking Lot is close to Shenzhen's second largest freight terminal Shekou Terminal. It is the supporting project of Shenzhen Metro Line 12 and the largest subway parking lot under construction in Shenzhen. After completion, it will undertake the parking and inspection of some vehicles in Line 12. The parking lot is 1050 meters long, the widest point is 370 meters, the narrowest point is 90 meters, and the total area is 24.1 hectares, which is equivalent to the size of 34 football fields. After completion, 40 subways can be parked.

There are about 1221 columns in the Chiwan parking lot, nearly 100,000 square meters of beams, and 328,000 cubic meters of concrete. Faced with the large concrete pouring volume, Shenzhen Metro Group and China Electricity Construction jointly created "mirror concrete" together, and each link of the concrete raw material coordination ratio design, construction plan, warehouse design, steel bar ratio and other links strictly controlled each link. Essence At the same time, the "Smart Site Information Center" has been established to make full use of the Internet, the Internet of Things and big data to achieve the refinement and intelligence of on -site management.

Metro Line 12 is a subway line that supports the development of western Shenzhen. The total length of the line is about 40.6 kilometers, and the entire line is set up on the entire line; there are 33 stations, including 18 transfer stations, which can be called the western "transfer king". This line starts from the left turret station of Nanshan District, and after wearing the central area of ​​Vietnam, Baoan Center, Fiyong District, Dakong Port and Exhibition Area from south to north, it finally goes to the East Station of Baoan District. As of now, the main body and field projects of the parking lot have been completed.

Content source: Shenzhen Special Economic Zone News

- END -

Jiangmen City becomes the most beautiful ecological environment volunteer

Jiangmen Daily (Reporter/Lin Lijun Correspondent/Jiang Xiaofeng) Recently, at the National Fifth National Home event site in the Sixth Five -Year Environment Day in 2022, the Ministry of Ecology and E

Create the community into a "warm harbor", and the social workers here have "maiden"

In order to improve the professional level of grass -roots social workers' talents...