The renovation and demolition work of the first high -speed rail elevated station in China was successfully completed

Author:Voice of Zhejiang Time:2022.08.03

On August 2nd, with the safe landing of the last platform framework, the existing Yongjia Station was officially completed by the construction of the 24th Bureau of China Railway Twenty -four Bureau, which marked the full row of the construction of Wenzhou North Station.

It is reported that the demolition method of Yongjia Station is demolished by manual mechanical methods. The three areas of the three areas from top to bottom are carried out simultaneously. After 96 blockades, the construction is completed 96 times and the demolition lasted 9 months. The demolition process is divided into four stages. The first stage is the construction of the four -power transition project such as the relevant contact network within the station demolition range. And out of the station), the fourth stage is to demolish existing platforms. The total demolition area of ​​Yongjia Station is 13,240 square meters.

The person in charge of the project of the Twenty -Fourth Bureau of the China Railway said that the entire demolition process of Yongjia Station is extremely safe. Most of the demolition operations must be built at night three -level blockade in the sunroof point. At the same time, near the construction line construction, the line has a wide range of long lines, many control points, and the weather impact on the high temperature and rainy season. The project department took the initiative to plan and actively perform many difficulties, and successfully completed the demolition of existing Yongjia Station as scheduled.

The successful demolition of Yongjia Station has created powerful conditions for the rapid construction of Wenzhou North Station. On the basis of the original two 4 lines, the newly -built Wenzhou North Station will increase the new lines to 5 13 lines, and the design scale of the station building has reached 56,290 square meters. In the future, Wenzhou North Station will also be introduced to the subway line to facilitate the travel of local residents.

After the Hangzhou -Wen High -speed Railway is completed and operated, the three major metropolitan areas of Hangzhou, Jinyi, and Wenzhou will be linked to open up the "one -hour" transportation circle in the last "one hour" of Zhejiang Province, and further promoting the common prosperity of socialism with Chinese characteristics and the provincial modernization advancement. important meaning.

- END -

Shooting 12 enemy aircrafts to seal the gods!Su-35s uses strength to prove that non-hidden fighter planes are still promising

Military and Military Secondary Point Author: Lu YanMany ace pilots were born duri...

Reminder | Single tax calculation end at the end of June, the taxpayer who has not yet been handled hurriedly

The 2021 individual taxation calculations ushered in the countdown and will end on June 30. The taxpayer who meets relevant regulations, if you forget to handle it before, have to hurry up the last ti