The three brigades of the high -speed one team carried out the safety inspection before the construction of the Nanshan Tunnel's diseased and insect pest treatment

Author:Huanghe News Network Luliang C Time:2022.08.04

At 9 am on August 3rd, Dong Wenqiang, a teachman of the three teams of the highway, and Chen Yanwu, the deputy brigade, organized the police to conduct a safety inspection of the preparation work before the construction of the Nanshan Tunnel's diseased and insect pest treatment, and effectively ensure the safety and smooth traffic of highway traffic in the jurisdiction.

At the construction site, the police viewed the establishment of the traffic safety facilities and safety protection of Xingxian East Diversion area, closure of ramps, and construction control areas. After the on -site inspection, the police put forward requirements for the construction unit for further highway construction safety: First, we must conscientiously fulfill the responsibility of the main body of production safety, strengthen the safety management of construction site, and timely allocate safety production related facilities and equipment; second, we must strengthen safety education and training of construction operators. Work to effectively improve the awareness of safety production responsibility; third, we must strengthen the investigation and rectification of hidden safety hazards, regularly carry out the work of safety protection hidden dangers, and effectively ensure the safety and effectiveness of protection measures for the construction section; , Guide signs, warning lights, deceleration warning signs, and isolation pier and other traffic facilities to update and repair the damaged transportation facilities in time; Fifth is to fully prepare for bad weather response. For the bad weather that may occur, to ensure the warning lights and shouting The facilities such as instruments, speakers, etc. are used normally to give full play to their role; sixth is to ensure that the personnel and equipment are completely evacuated after the construction, keep the pavement clean and no obstacles, and ensure that the road is normal.

Through this inspection, the safety protection awareness of the construction personnel was effectively strengthened, the hidden safety hazards existing during the construction of the highway were eliminated, and it laid the foundation for the successful completion of the highway safety construction.

Three brigades of Shanxi High -speed Traffic Police Squading:

The G59 Hubei High Speed ​​Highway Lins section, 10:00 on August 3, 2022 to 24:00 on September 21 (50 days), Xun Lan went to the "Nanshan Tunnel" in the direction of Linxian for disease treatment.

During the construction, the main line between Xingxian Dongzhixing County South Toll Station was closed, and all vehicles to Linxian were divert at the exit of Xingxian East Toll Station. The original traffic vehicle was driven out of Xingxian Dongdi Station, bypassing National Highway 337 (freight vehicles bypassing Beishan transit roads) and 218 provincial highway, and Xingxian South Toll Station entered.

The majority of drivers are requested to regulate travel routes in advance, keep a safe distance during driving, and it is strictly forbidden to break the regional section of the control area. (Shanxi high -speed traffic police)

- END -

Father in the eyes of the 80s: My father is a "fashionable" architect

My father was born in 1963 and is now almost 60 years old. He is a farmer and an a...

Municipal State -owned Assets Supervision and Administration Commission to highlight the needs of corporate reform and development to promote practical activities

The party committee of the Municipal State -owned Assets Supervision and Administration Commission attaches great importance to the grass -roots levels of the people's affairs to solve the people's he...