The visibility is 1 meter, and the Caidian Lotus Lake has a "underwater forest"

Author:Pole news Time:2022.08.04

Jimu News reporter Wang Jun

Video editing Wang Jun

Correspondent Li Zhu

"Now walking on the shore of the Lotus Lake no longer smells the smell of water quality. I will walk with my family every morning and evening with my family every morning and evening." On August 3, Ms. Liu, who lives in Gujing Road, Caidian Street, happily gave reporters to reporters Said.

On the morning of the 3rd, Jimu Journalists came to the Lotus Lake Lake Lake Bareer Platform in front of the Federation of the Trade Union of Cai Dian District. The "underwater forest" landscape visibility of 54,800 square meters is about 1 meter.

Clear Lotus Lake Water Clear Coast Green

The reporter learned that Lianhua Lake is composed of 7 lakes in the city of Caidian District, with an area of ​​0.279 square kilometers, a coastline length of 6.2 kilometers, a volume of 270,000 cubic meters, and an average water depth of 1 meter. Previously, seasonal cyanobacteria "water" broke out in some waters, and the water quality was V-inferior V.

In order to repair the water body, the comprehensive governance project of Lianhua Lake in Caidian District. Through the implementation of water pollution prevention projects, water ecological restoration projects, improvement of water landscapes and water culture, the waterfront city space of the lotus lake is realized, the citizens, recreational and landscape functions are combined, and the urban planning of Caidian District is combined to form a urban water body. The ecological scene of shore green and Jingmei "is expected to be completed in June next year.

The person in charge of the comprehensive governance project of the Lotus Lake in Caidian Qingshui into the Jiang PPP project introduced that for a long time, the rainwater along the Lake City Pass was discharged directly into the lake. When the rain is raining, some domestic sewage will also be discharged into the lotus lake through the flow of overflow, which causes the lake to be rich in nutrition. In November last year, the drainage port on the shoreline of the Lianhua Lake Lake was blocked. Installed intelligent diversion wells through the implementation of rain and diversion, and the rain and dirt around the lotus lake were collected and all treated.

It is reported that while renovating the exit of the lake shoreline and the pipe network, Caidian Qingshui entered the river PPP project Lotus Lake Comprehensive Governance Project No. 1 Lake Shenshui plant mainly chooses dwarf bites with strong water purification capacity. A few days ago, after half a year of water quality monitoring of professional institutions, the water quality of Lianhua Lake No. 1 has reached the standard of the surface water IV standards. The black and odorous phenomenon of water body has basically disappeared.

It is understood that it is different from other water projects. The cooperation period of Qingshui into the river in the eastern area of ​​Caidian is 20 years, of which the construction period is 3 years and the operating period is 17 years. This means that these pipe networks and lakes are managed. Invisible improvement of use efficiency and service life, effectively solving problems such as sewage discharge.

(Photo by the picture by Jiomu reporter Wang Jun)

- END -

Comments | Create to sharing and sharing without you and me

In the summer of flowers, the creation atmosphere of the national civilized cities in Harbin is becoming increasingly strong. Creating the city is not only about the image of the city, but also the

Chaobu Town, Minxian County accelerate the construction of standardization to promote the reform of "decentralization and management service" and then go to a new level

为全面贯彻落实县委、县政府关于“放管服”改革优化营商环境的各项决策部署,确保全镇深化...