Hohhot!smooth!

Author:Hohhot Evening News Time:2022.08.05

The travel problem is the topic of people's livelihood that the masses are most concerned about. With the continuous development of urban construction, Hohhot's urban area has continued to expand and develop to the periphery. The city's appearance has changed dramatically, and the urban population has also increased year by year. Some new communities have sprung up. At the same time, there are some "broken roads" and "bottleneck roads" between some new communities and urban main roads and skeleton bridges, which brings a lot of inconvenience to the people's travel.

This year, in accordance with the party committee and government of the autonomous region and the government to implement the "strong capital" project decision -making and deployment, Hohhot focused on the construction of "Wuyi City", and in accordance with the overall principles of "regional Unicom, local micro -circulation, and dredging congestion points", it focused on making the people travel smoother smoother. , Implement 31 "broken roads" project, build 75 roads in new construction, build 6 viaduct projects, and accelerate the construction of the urban road network system of "four rings and eight verticals".

Recently, Hohhot had another group of "broken roads", and the "blocking roads" became a "comfort road".

Open the "Broken Road" smooth microcirculation

"After the Inner Mongolia Maternal and Child Health Hospital moved to the North Second Ring Road, people could only enter from the hospital's South or West Road. Due to the large vehicles, they often traffic jams. It's more convenient. "Mr. Ge, a citizen.

On August 1st, three "Broken Roads" of the three "Broken Roads" of the three "Broken Roads" on the East Road of Fengzhou North Road, Inner Mongolia Maternal and Child Health Hospital, and the North Road of the Inner Mongolia Maternal and Child Health Hospital were opened to traffic on the same day. The opening of these "broken roads" has greatly facilitated the travel of the surrounding people.

According to Ren Zhenping, director of the Housing and Urban -Rural Development Bureau of Xintong District, this year, Xincheng District plans to open up 8 "broken roads", including the Xixin District Government West Lane, Xinshuyuan West Lane, Longyu Lane, Inner Mongolia Maternal and Child Health Hospital East Road East Road , North Road, Inner Mongolia Maternal and Child Health Hospital, Fengzhou North Road, Guanghua Street, etc., the total length is 5.26 kilometers. At present, it has been constructed. It is expected that it will be completed by the end of August.

The East Road and North Road of Inner Mongolia Maternal and Child Health Hospital are 665 meters long on the road, the red line width is 24 meters, the roads are 18 meters, and the sidewalks on both sides are 3 meters. The project started at the end of April this year. After the completion of these two roads, the structure of the surrounding road network of Inner Mongolia's Maternal and Child Health Hospital will be further improved, and the problems of poor travel of the Inner Mongolia Autonomous Region Measurement and Testing Research Institute will vigorously improve the efficiency of the surrounding people.

Subsequently, the reporter came to the North Road of Wetland Park along Bin Henan Road. I saw that the new road was just connected, and nearby residents praised it.

According to Wu Jun, deputy director of the Housing and Urban -Rural Development Bureau of Yuquan District, in 2022, Yuquan District will focus on the "broken road" around Fanjiaying, Dong Erdao River and other shantytowns and real estate development projects. 10 "roads, the road construction length is 7.08 kilometers. So far, 6 have been opened, and the other 4 will be opened to traffic at the end of August and early September. After the opening of these roads, the framework and the space for the urban construction of Yuquan District have brought more solid convenience to residents, and continuously enhance the sense of gain and happiness of citizens.

According to reports, Wetland Park North Road west of R & F Road, East to Linkle Road, with a length of 791.967 meters and a red line width of 50 meters. The construction content includes road engineering, transportation engineering, road lighting engineering, drainage engineering, and accessories. From the north of R & F Road, Galaxy Henan Street and south to Wetland Park North Road, the road length is 324 meters, and the red line width is 40 meters. The construction content includes road engineering, transportation engineering, road lighting engineering, drainage engineering, and auxiliary engineering. After the two roads are completed and opened to traffic, the structure of the surrounding roads around Nanhu Wetland Park will be further improved, vehicles in the peak period of traffic in Henan Road, Henan Road, and play an important role in serving the needs of new residents in the surrounding communities.

There are 106 "Broken Road" and "Fourteenth Five -Year" period.

According to the reporter's understanding, during the "Fourteenth Five -Year Plan" period, all the city will eliminate the existing 106 "broken roads" in the urban area. It is planned to open up 31 in 2022, 27 units in 2023, 29 through 2024, and 19th in 2025. The 31st "Broken Road" project implemented in 2022 has opened 4 "Broken Roads" in Xing'an South Road, Wuhai East Street, Xilin South Road, and Exhibition Hall in May; There are 15 "broken roads" including the extension of the Silk Road Avenue; in October, the remaining 12 "Broken Roads" will be opened.

Construct a "one horizontal two longitudinal four ring" elevated road network system

"I haven't come to Hohhot for several years. I did not expect to build several viaducts. The navigation allowed me to walk down a passage from Corqin Expressway, and got on the second ring road, and finally arrived in my sister's house. In my house. In the impression, Hohhotho, a few years ago, felt very congested on the road. This time, I walked a few viaducts. I felt that the traffic in Hohhot was smooth and my mood was very comfortable. "Mr. Liu, who came to Huhou, said with emotion.

It is understood that in order to make the masses travel smoother, our city must build a "one horizontal, two vertical and four ring" elevated road network system in terms of elevated road networks. Among them, "one horizontal" is the extension of the east extension of the Hailar Street and the extension of the west of Jinhai Road. "; Building Bayannaoer Road and Third Ring Road, it is planned to" China Unicom "in October; the" Four Ring "is that the" closed loop "will be opened to traffic in October in October, and it will be renamed the fourth ring road around the city.

The total length of the Third Ring Road project under construction is 87.8 kilometers. Among them, the Southwest Line is 21.3 kilometers, 16.8 kilometers in the southeast line, and 11.2 kilometers on the east line. Shepherd, Hozhun, Korqinnan, Yongji, New Airport, Korqinbei, Jinhai and other seven -seater. After the entire line on October 1, it will effectively dissolve the traffic pressure in the city, further improve the urban form, open the main framework of the city, and simultaneously realize the effective connection of the main urban area, Helink New District, and Illi Health Valley. Jinsheng Expressway Promotion Reconstruction Project is a traffic road connecting and the main urban area of ​​Lindel New District and Hohhot City. At the intersection, the transformation project (south+northern section), Jin Sheng all road, and Jin Sheng 2nd Road. At present, the project 8.7 kilometers southern section and 17.3 kilometers auxiliary road project have been opened to traffic in 2019. The main road of 6.03 kilometers in the north section was basically completed in October 2021. The 3.54 kilometers of the viaduct was opened to traffic at the end of 2021. The construction of the river under the Dahei River Clamping Bridge, the bridge lighting project, and the authentic fire protection project of the welfare institute. The construction of Jinsheng Expressway improvement project will greatly alleviate the traffic pressure between the new district and the urban area, further improve the optimized business environment with Linkl New District, and promote the implementation of high -quality industries.

Implement 75 road projects within the year

Reporters along Bin Henan Road came to the Silk Road Avenue and the south extension section. I saw the spacious roads extending to the Third Ring Road, and the greening and street lights on both sides of the road were also completed simultaneously.

According to reports, the Silk Road Avenue extension project is one of the new roads in our city this year. It starts from Huimin Street in the north, and the Dahei Hebei Didou Road in the south, with a total length of 1.68 kilometers and two -way 8 lanes. Guiding the region of the central area of ​​the eastern urban area to evacuate the comprehensive group of the peripherals, which has also completely realized the rapid conversion of the second ring road and the third ring road in the section of the road.

"I used to go to Dahei River to watch flowers around Kerqin Road or from Zhaowa Road to Wuhai East Street to reach the Dahei River coast. Now after this road is opened to traffic, it can go directly from the urban area along the Silk Road Avenue. It's so convenient! "Citizen Liu Yu said happily. The newly opened Silk Road Avenue extends the road width and less car, and the scenery along the road is picturesque. Walking on this road makes people feel very comfortable. Essence

As a structural main road and eastern ecological corridor, the Silk Road Avenue is an important "one vertical" in the city's "eighteen horizontal and sixteen vertical" main road network. The Silk Road Avenue moves north and south, starting from the ecological barrier of the Laichuan Grassland in the north of the north, extending to the south to the South Third Ring Road connects the Dahei River Country Park, which can achieve the thorough penetration of the second and third ring roads, forming a fast and convenient city. Skeleton road network structure.

According to reports, in terms of the "blank" of Buqi Road, Hohhot will supplement the shortcomings of road infrastructure in the urban blank area within 3 years. The channel block and the southeast security village block implemented 75 road projects, and used new technologies such as asphalt local heat regeneration to update 25 "main roads" to comprehensively improve the structure of urban road networks.

Reconstruction is easy to block the streets

"In the past, there was no decent road on the west side of our community. When the old community was transformed, the original sandy road was fixed into asphalt roads. Now people are convenient for people." Said Mr. Li, resident of Huyun District, Huimin District.

Tengfei Road belongs to the main road of the city. Among them, Ruyi and the Street -Xueyuan Street section is a two -way four -lane, while the other sections of Tengfei Road are two -way six -lane. With the development of cities, traffic flow continues to increase, and the ability to pass the four lanes has gradually decreased, becoming one of the road blocking points. In order to open up the "obstruction" of the section, the construction of the Municipal Housing and Construction Bureau and the construction of the Municipal Urban Investment Construction Group have been fully launched to comprehensively start the renovation and upgrade project of the section. After 4 days of intense construction, the original two -way four -lane lane was successfully changed to six lanes. "When driving from north to south to Xueyuan Street, you need to quickly reduce the speed of the vehicle, because the driving lane has decreased, and the vehicle is easy to congestion." The drivers in the past said that this road is now very smooth, which has greatly improved the vehicle's vehicle Pass capability.

This year, the Municipal Housing and Urban Construction Bureau belongs to the Municipal Construction Service Center to take the Conducting Points as a key task of this year, making efforts for the construction of the "Wuyi City" to continue to promote the transformation of congestion points.对易形成拥堵的节点,年初会同设计单位现场摸排踏勘,精心分析研究设计改造方案:有的采取拓宽车道,有的渠化优化路口设置,有的拆移障碍物,有的合理配置人行道、非Infrastructure such as motor lanes, car roads, etc., some are transformed into the rolling stone ramp, and some optimize the signal lights. Through these transformation and adjustment, focus on eliminating the "bottlenecks" of key nodes, improve the smooth rate of roads, and improve the traffic environment.

In order to minimize the impact of the travel of citizens, maximize the travel environment of citizens, coordinate the coordination of traffic management, urban management and other departments due to local policies, optimize the time to determine the time of linkage transformation, and change signal lights, street lights, pipelines, etc. at night and weekends. Through the "May 1st" holiday, 53 areas of easy blocking points are uninterrupted and uninterrupted by 53 areas such as Pengfei Road Beiyuan Street, Tengfei Road Haidong Street intersection, Zhaojun Road Water Plant intersection, surrounding Inner Mongolia Hospital, Inner Mongolia Medical University Affiliated Hospital. Extremely completed the renovation task scheduled at the beginning of the year. According to reports, in terms of dredging the congestion point, the city combined with 140 "alley roads" in combination with the old community, which has been completed after half of it. 97 stations have been renovated, and all have been completed. It has truly realized the "blocked road" into "comfort road", allowing the masses to travel smoothly.

Source: Hohhot Daily Reporter Liu Lixia Tu: Reporter Xu Ting

Coordinating/Dong Xianhe School Reading/Dong Xianhe Preliminary Trial/Zhang Ying Zhang Yao Final Trial/Zhao Min

not

not

not

- END -

Beauty models one -on -one special services can be enjoyed by recharge membership cards

High -end men's private SPA clubWhat you want, we all have Jade Girl Heart Sutra, ...

Butterfly changes | Party building leads to promote development, organize revitalization to enlighten Vanity

Xinlian Second Village, oneNew Lianlian Village, Dagang Town, Nansha District, Gua...