This highway in Guizhou has made new progress.

Author:Guizhou Daily Time:2022.08.10

A few days ago, the website of the Guizhou Provincial Department of Transportation issued the "Announcement of the Construction Supervision of Anshun to Panzhou (Guizhou and Yunnan Realm) of the Shanghai -Kunming National Expressway (Qian Yunnan Realm) Construction Supervision Announcement".

The announcement shows that the expansion project (hereinafter referred to as "this project") project feasibility research report (hereinafter referred to as "this project") project feasibility research report has been expanded by the Guizhou Provincial Development and Reform Commission. The number of documents is approved by the Guizhou Provincial People's Government. approve.

It is reported that the project starts from the twelve miles camps (hubs) on the east side of Puding County to connect with the planned Shanghai -Kunming Expressway Guiyang to Anshun section expansion project, Anshun West Around and Pu'an Expressway. The Yanfeng cave, the intended Shanghai -Kunming National Highway, Yunnan Fuyuan (Guizhou and Yunnan Realm) to the Kirin section expansion project with a total length of 173.378km. Among them, the interaction section of the Rockfoot East Hub was interconnected to the deserted field hub 39.313km, and the co -line of the National Expressway of the Nayong to Qinglong (the project is not in this project), and the actual construction mileage of this project was 134.065km. The design speed of the entire line is 100km/h, the width of the roadbed is 33.5m, and the asphalt concrete road surface.

Twelve miles camps (hubs, reconstructions), Pudingnan, racecourse, Longhe, rockfoot east (hub, some ramps), barren fields (hub) grids, flowers, mother -in -law, mud, Jichangping ( East), talc (hub), and Panguan 13 interchanges, reserved 1 interchange of wild clocks (hubs). Simultaneously construct 6 interconnected connection lines, with a total length of 34.741km.

There are 92 bridges across the board, with a total length of 40581m. Among them, there are 8 eight bridges, with a total of 10704m; 78 bridges, a total of 29401m; 6 small and medium bridges, 476m in length.全线共设隧道35座,总长36078m,其中特长隧道1座,长742m(终点处岩峰洞隧道不含云南境内长度);长隧道15座,长24926m;中隧道10座,长6642m;短隧道9, 3768m long, 58.6%of the total length of the bridge tunnel. There are 13 interchange interchanges, 2 separate interchange, 3 separate interchange, 3 in service areas, 2 parking areas, and 9 toll stations (containing sludge toll stations); there are 6 connection lines throughout the line, with a total length of 38.9km.

Announcement of the Construction Supervision of the Shanghai -Kunming National Expressway Anshun to Panzhou (Guizhou and Yunnan Realm)

(Source: Guizhou Provincial Department of Transportation)

Edit: Hu Rong

- END -

Sichuan Yuechi holds up the "supervision" to help the business environment and optimize the business environment

Discipline Inspection Supervisor Cadres to the enterprise understand the situation...

Shiyan Zhangwan District Berlin Police Station carried out a series of anti -drug publicity and education activities

Shiyan Guang Telecom (all -media reporter Yu Bo Correspondent Li Mingguo) Recently...