Tips for travel: During the municipalization reconstruction of the North Third Ring Road in Fuxing Street, please detour temporarily

Author:Shijiazhuang News Network Time:2022.08.10

In order to ensure the safety of roads during the reconstruction of Fuxing Street and the Municipalization of the North Third Ring Road, to the greatest extent, avoid traffic accidents and traffic congestion due to road construction, and the construction road section and import and export connection lines are connected. Temporary detour, Shijiazhuang traffic police warm reminder:

I. Deting time: From August 7, 2022 to the end of the construction.

2. Construction and connection line section

1. Fuxing Street (Shijiazhuang North Toll Station to Shijiazhuang South Toll Station) section, Luancheng entrance and exit to the G308 connection line section;

2. North Third Ring Road (Shijiazhuang West Toll Station to East Third Ring Road North Five Women's Interoperability), East Third Ring Road, North Five Women's Interoperability to Shijiazhuang East Toll Station, and the entrance and exit of Shiqing Road in the North Third Ring Road to Shiqing Road connection line section;

3. Import and export ramps in the above section.

Third, bypass the transit route

Highway detour routes: Beijing -Hong Kong -Macao Expressway, Qingyin Expressway, Xibaipo Expressway, Jinshi Expressway, Beijing -Kunming Expressway, and North Wound Expressway.

National and Provincial Turbus Ring route: G234 (Jingzan Line), S203 (Non -Fan Line), G338 (Zhenggang Line), X060 (Jingyuan Line), S337 (Hengjing Line), S204 (Xin Zhao Line), G515 (G515 Dingjun line).

Fourth, coal transportation vehicles bypass transit channels

Northern Transportation Channel: The northern part of Shijiazhuang City is in the northern part of Shanxi and the west of Baoding west. , Xinle, Wuji, and Shenze passed the country to Huanghua Port.

Southern Transportation Channel: Shijiazhuang City's Southern Southern Xiangyang Medium -sized Cargo Vehicles can use the transit of G339 (Binyu Line) uniformly determined by the Provincial Transportation Department.

5. For emergency rescue, urban people's livelihood demand, urban logistics distribution, and high -quality cargo vehicles and special operating vehicles that need to enter roads in the urban area, urban logistics distribution, and guarantee of urban operations, according to the "Shijiazhuang People's Government, released on December 9, 2021, The announcement of the urban road traffic management "requires the application for electronic permits, and passes according to the specified time and route.

6. Vehicles on the section of the construction section shall be passed by the speed limit of the prompt.

- END -

Walking in front of the new bureau | 61.8 kilometers of green roads starting a new situation of high -quality development of the global tourism global tourism

Editor's note:Keep in mind that the instructions will go in front, and the mission...

Follow | Shandong Modern Light Industry Textile "Three Products" Consumption Season starts

Shandong Modern Light Industry Textile Three Products Consumption Season was launc...