[Civilization creation · We are in action] Maiji District: Increase the construction of municipal facilities to build a good travel environment for citizens

Author:Maiji Rong Media Time:2022.08.15

Maiji District Rong Media Center News (Reporter Wu Xueyu Wang Boya Intern Reporter Mao Huihi) The facts of benefiting the people have affected the deep expectations of the people. Since the launch of the work of the city, the Maiji District Housing and Construction Bureau has grasped the "hard standard" of municipal infrastructure construction, accurately improve the level of municipal facilities management and protection, continuously builds the foundation of civilized cities, and strives Urban human settlement environment.

Recently, the reporter came to the eastern section of Longchang Road in Maiji District to learn that because the residential area was completed early, many road bricks had been damaged on the road. In this regard, the staff arranged by the District Housing and Construction Bureau were Remove the old pavement and breaking the bricks, replace the new bricks of the same color, and flatten the road. And add or modify the barrier -free channel for some areas to ensure the safety of the public. At the same time, in other sections of the urban area, the staff also trimmed and sorted the sidewalk trees in a timely manner, and made some necrotic seedlings found in the inspection.

Li Kai, a cadre of the District Housing and Construction Bureau, told reporters: "At present, the construction and maintenance of nine main roads in the district has been fully started. For Longchang Road, we have arranged 6 construction units to be divided into 8 teams. The channels and blind tracks are fully constructed and maintained. It is expected to be fully completed before the 18th of this month. "

据了解,此次麦积区住建局负责建设维护的9条主次干道包括陇昌路、前进路、兴陇路、区府路、成纪大道麦积段、中心大道、埠南路、羲Emperor Avenue Maiji section, Tianhenan Road. It is expected that after the completion of the comprehensive rectification before August 18, it will continue to carry out comprehensive construction and maintenance of the back streets and alleys.

"In order to do a good job in the creation of a civilized city, further increase the supporting construction and maintenance of the municipal infrastructure of Maiji City, and ensure the safe operation of various supporting facilities. Details. It is planned to uniformly maintain the problems of roads in some roads in the urban area, damage to sidewalks, damage to lighting facilities, blind roads, and lack of fate stone slopes. Create a good travel environment for the general public, "said Yang Liangliang, an engineer of the Housing and Urban Construction Bureau of Maiji District.

At the same time, the District Housing and Urban Construction Bureau also launched the aging pavement maintenance project of Tianhe North Road and other urban areas of Maiji District. The project includes the overall oil paving of the pavement on the south road, the overall oil paving of Tianhebei Road and No. 1 bridge; Wait for work. The project has been constructed on August 10 and is expected to be fully completed at the end of September. 【Edit Liu Meili】

- END -