Shandong will build a modern water network pattern of "one axis, three rings, seven vertical nine horizontal, and two lakes"

Author:Poster news Time:2022.08.16

The reporter learned from the Provincial Department of Justice that the Standing Committee of the Provincial People's Congress recently reviewed and approved the "Decision of the Standing Committee of the Shandong Provincial People's Congress on Strengthening the Construction of Modern Water Networks in Shandong" and implemented it from the date of announcement. The decision is of great significance to accelerate the construction of Shandong Modern Water Network, improve the configuration of water resources and the defense capabilities of water and drought disasters.

It is reported that the decision clarified the overall goal and water network structure of the construction of the modern water network in Shandong; stipulated that the construction of the modern water network of Shandong should follow the water control idea of ​​"water -saving priority, space equilibrium, system governance, and two -handed force"; The goal requirements of complete, safe and reliable, intensive, high -efficiency, green intelligence, unobstructed circulation, and orderly regulation and controlling modern water network system "; clarify the provincial, municipal, and county -level water network architecture to accelerate the construction of" one axis and three rings, seven vertical nine nine nine nine The overall pattern of Heng and Lakes and Lakes makes specific requirements for the smooth circulation of the water network.

Decision also requires the establishment and improvement of water safety risk research, prevention and control collaboration, and prevention and resolution mechanism, formulate risk emergency plans, and regulate the water network engineering safety protection mechanism, and establish a full -chain management and control mechanism. Clarify the water -drought disaster defense engineering system with rivers, reservoirs, lakes, and flood storage areas, and improve the monitoring and early warning system of flood disasters.

Decide to clearly stipulate the improvement of modern water network construction incentives and reward mechanisms, and achieve remarkable results in the implementation of funds in modern water network construction and completion of investment plans. Essence (Jinan Daily reporter Yang Chen)

- END -

Tianzhu: sufficient reserves of grain and oil supplies

Since the prevention and control of the epidemic, the Development and Reform Burea...

Longli: "Three accelerations" to promote the landing policy of the stable return

In order to send the state and provincial and states to the enterprise in a timely manner, increase the return of the unemployment insurance to stabilize the work, and support the stable existing posi