Xinxiang City Textile Road "Broken Road" is expected to be opened within the month

Author:Xinxiang Daily Time:2022.08.17

Open the "broken road" and travel smoother. At present, the opening of the "Broken Road" project by Textile Road (Labor Street to Xiangyang Park) is seizing construction. It is expected that the opening conditions will be available at the end of August.

It is understood that there are many breakpoints and long distances in our city, which is one of the main reasons for urban congestion. For a long time, the city has continuously increased the construction of the "broken road" in the central urban area, further enhanced the density of the road network, unblocked microcirculation, promoted the high -quality development of the city, and enhanced the sense of happiness and gain of the masses.

On the morning of August 16th, the reporter saw at the construction site of Textile Road (Labor Street to Xiangyang Park) that various large -scale construction machinery shuttled through, and the construction workers conducted various operations at high temperatures. "At present, the spinning road project is basically completed, and the latter is currently being dealt with." Humanities Yongchao, the on -site construction, introduced.

The textile road project is a key people's livelihood project in our city. The construction scope starts from the west, and the east to Xiangyang Park has a total length of 260 meters. The red line is 26 meters wide. This construction includes road engineering, dirty rainwater projects, lighting engineering and greening projects. The overall project is expected to have traffic conditions by the end of August, which will greatly improve the surrounding traffic capacity.

Xinxiang Daily All Media Reporter Chen Zhuo

Edit Liu Ling

- END -