Our city starts the flood prevention level IV emergency response

Author:Shantou released Time:2022.06.18

The reporter learned from the Municipal Emergency Administration that according to the report of the hydrological department, due to the flood discharge and rainfall supplement of the upper reaches of the Han River, the flood peak flow of 10,700 cubic meters per second appeared at 12:10 on the 17th of the 17th. Once an encounter, it is close to the alert water level of 13.50 meters, and this traffic is the largest since 2008. According to the meteorological department, the city is affected by high -altitude grooves and southwest monsoon in the next few days, and precipitation is still frequent. Land is accompanied by strong convective weather such as thunderstorms and short -term winds at 6 to 8.

Due to the high risk of geological disasters and rivers and rivers, it is necessary to pay close attention and do a good job of relevant defense work. According to the "Shantou City Flood Control, Drought Prevention and Wind -proof Emergency Prevention Plan", after discussion and judgment, the Municipal Three Defense Headquarters decided to be on June 17th At 17:30, the flood prevention level IV emergency response was activated. To this end, the Municipal Emergency Administration immediately launched the flood prevention and preparation work, and dispatched the multi -party forces to move rapidly to ensure that the team can draw, rush, and win, and make every effort to build a flood prevention line defense line.

The reporter learned that from 08:00 on June 13th to 12:00 on the 17th, due to the high -altitude grooves and southwest monsoon, there was a local heavy rainstorm in the city, and the cumulative rainfall in the city was 96 millimeters. In the past 15 years, the biggest floods in Shantou were emergency floods to the bridge gates in the Hanjiang River to ensure the safety of bridge gates and river bank dams.

Since the 13th, 9,485 inspections of various types of inspection and rescue rescue personnel have been dispatched in the city, 270 vehicles and machinery of various rescue vehicles and machinery were dispatched, and 1989 hidden dangers were built in dangerous houses, 817 water conservancy projects, and 39 hidden dangers of geological disasters. There were 167 people in the dangerous area of ​​118 households, 67 hidden dangers were excluded, and 17 waterlogging accumulated water was disposed of.

Relevant staff of the Municipal Emergency Administration said in an interview with reporters that due to the early multi -round rainfall and upstream water superposition, Hanjiang's water level continued to rise.

In response to the emergence of the water in the Hanjiang River Basin for nearly ten years, the water office required the water level, traffic and flow rate changes in the upper reaches of the upper reaches of the Hanjiang River Basin, and the five gates of Hanjiang went out to the sea in time to respond to the emergency response and make the river in advance. Pre -leak pre -arrangement work, take the sky. Jinping, Longhu, Chenghai, and Water Affairs Department must coordinate upstream and downstream, take into account the left -handed shore, scientifically dispatch flood control projects, implement various measures such as pre -leaking, flood storage, and flood division, strengthen flood monitoring and dyke inspections, and timely transfer people in low -lying areas along the river. At the same time, conscientiously implement the "three connections and three links" and the special group disaster to move the "four one", strengthen the risk inspections of disaster, and do a good job in the safety transfer of the masses. According to statistics, the city has shifted a total of advance shifts in advance There were 118 people in dangerous areas such as slope construction, mud brick houses, dangerous houses, and low -lying area of ​​the river. All localities and departments should strengthen duty on duty in accordance with the requirements of relevant plans, earnestly perform their duties, earnestly do a good job of heavy rainfall and might cause secondary disaster defense work, go all out to ensure the safety of the lives and property of the people, and minimize the loss of disaster.

In addition, the Municipal Fire rescue detachment of flood rescue rescue rescue professional teams have gathered on standby. 10 anti -flood rescue rescue teams have made "equipment on the car, boat boats on the shelves, and the equipment enter the box" to fully enter the actual combat state. The Shantou detachment of the Armed Police implemented more than 300 sets of rescue equipment and eight charge boats to dispose of 100 troops for the first echelon of the mobile squadron for the first echelon. Actively prepare for rescue and rescue for flood prevention.

Source Shantou Daily

- END -

National Standards for Affairs in the Field of Organs' Affairs "Terms of Affairs of the Af

Xinhua News Agency, Beijing, June 13 (Reporter Zhao Wenjun and Van Si Xiang) The National Standard (GB/T 41568-2022) has been approved and implemented by the General Administration of Market Supervisi

Hengshui City Trade Promotional Council visited Zaoqiang County to investigate the development of foreign -funded enterprises

Visit the development of foreign -funded enterprisesOn June 23, Jiao Zhenxue, secr...