[Follow] Do a good job in flood prevention work in all parts of the province

Author:Yunnan released Time:2022.08.28

To effectively deal with the recent

The heavy rainfall weather appeared in most parts of the province

Actions quickly and compact responsibilities in various places

Precautions

Effectively grasp the flood prevention and disaster reduction work

Baoshan City

Baoshan City held a timely conversion work meeting of flood prevention, drought resistance and disaster reduction, and achieved early research, early planning, and early deployment, mobilizing all levels of all levels of the city to do real flood prevention and disaster mitigation preparation, and constructing a horizontal and vertical and vertical command system. "A survey of emergency rescue teams in the city has conducted a survey of emergency rescue teams. The investigation registered with a volume of flood control and disaster reduction experts with a team of 25 people and 261 8970 emergency rescue teams. Live and win. "Xiao Zhihua, deputy director of the Paushan City Emergency Administration, introduced that key departments such as emergency, meteorological, water, hydrology, and natural resources strictly implement the 24 -hour duty service model in the job on duty. , To be fully prepared for the disaster, further strengthen the analysis and judgment of risk analysis, and focus on the hidden dangers to investigate and rectify the rectification, the release of the forecast and warning, and transfer the risk aversion in advance.

Xishuangbanna Dai Autonomous Prefecture

The Xishuangbanna Dai Autonomous Prefecture Flood and Drought Resistance Headquarters, Water Resources Bureau, Hydrological and Water Resources Bureau, and counties and cities have launched emergency response, requiring high attention to the "three major risks" of over -standard floods, reservoirs, and flood disasters. The standard flood does not disrupt the battle, the floods within the engineering prevention standards are not unexpected, the reservoir does not cause the dams of the dams due to the lack of work, and the "four no" goals of the flood disasters will not occur. Water engineering flood prevention and drought resistance scheduling and flood rescue techniques support the "three responsibilities" work goals.

Nujiang Lang Autonomous Prefecture

The Nujiang Lang Autonomous Prefecture promptly analyzed and judged the flood prevention situation, carried out hidden dangers to investigate and rectify, and re -arranged and deployed monitoring and forecasting early warning, material reserves, flood prevention drills, etc. Carefully sort out the responsibility for flood prevention in key areas, important reservoirs and hydropower stations, and major rivers, and clarify the person in charge of the 4th level flood control administrative responsibility and form a list of responsibilities. Establish a working mechanism for flooding disasters in special groups, and strengthen the implementation of the liability for contract insurance. Establish the launch mechanism of disaster transfer, village (community) transfer list, and special group flood control working group, build a township (street) transfer system, produce flood control responsibility packets "understanding cards", strengthen the implementation of contract security responsibilities to implement Make sure that flood prevention emergency rescue work does not leave blind spots or dead ends.

at the same time

Further enhanced all over the province

"1262" meteorological early warning emergency linkage response machine

Comprehensively weaving the "defense network" during the flood season

Baoshan City monitors and early warning results around the meteorological department, and promptly reminded important weather, rain and water conditions, floods, and danger in a timely manner to "respond, wake up" to counties (cities, districts), transmit them to township (town), village (village group), and village (village group), and To households, to people, timely organize disasters to divert and avoid risks. Xishuangbanna is fully implemented as a mechanism to ensure that the forecast and early warning information is transmitted to the front line in a timely manner. Resolutely keep the bottom line of the flood control safety. Nujiang Prefecture analyzes the rain and water love every day, strengthen the duty on duty and information reporting, and do a good job of preventing and cope.

Written article: Hu Meijun Yang Yanpeng Dai Zhenhua Li Shouhua

Source: Yunnan Daily

Edit: Guo Wanting

- END -

"West Youwu" market fire "toast with the world" ice cream popularity

Recently, Qingdao West Coast Cultural Tourism Market Collection of West Youwu tour...

The 22 -year -old Chinese girl was shot in the United States to kill the corpse's mother with grief

Niki Huang (left) and the vehicle (right) burned at the time of the incident.Overs...