The main bridge of the Malan Bridge in the canal Zaozhuang section smoothly meets the dragon
Author:Zaozhuang Daily Time:2022.08.29
(Photo by Li Qing, a reporter Wang Longfei, a reporter from Zaozhuang Daily)

Recently, the main bridge of the Malan Bridge of Tai Erzhuang District, the second -level channel rectification project of the Zaozhuang section of the Beijing -Hangzhou Canal.The second -level channel rectification project of the Beijing -Hangzhou Canal Zaozhuang section is 38.5 kilometers in length, mainly consisting of channel rectification, emergency channels, Malan Bridge, and informationization.After the completion, the main waterway slope of the Zaozhuang section of the Beijing -Hangzhou Canal is stable, clear, and shore.
- END -
Cold air calls you to add clothes!The rainstorm continues today and Ming, and the maximum temperature in many places is up to 20 ° C.
Go out early in the morningCalmly coming from the noodlesAccompanied by rainCool o...
Kuiwen District builds a digital flood prevention command system to build flood control safety dams
Kuiwen District is located in the central urban area. Flood prevention and typhoon...