The water conservancy department makes every effort to do a good job of flood defense work in Xijian

Author:Chinese water conservancy Time:2022.06.09

Since June 3, the Pearl River Basin has occurred two continuous heavy rainfall process, with cumulative surface rainfall 71 mm. Affected by the rainfall, the flood of the Xijiang dry flow in 2022, the middle and lower reaches of dry flow to the capital of the capital, of which the water level of the flooding peak of the flood peak at 8:30 on the 8th of Guangxi, exceeded the alert water level 1.81 meters, and the corresponding flow of 33800 was 33800 Cubic meters per second; a total of 46 rivers in 5 provinces (autonomous regions) including Fujian, Guangdong, Guangxi, Guizhou, and Yunnan in the basin have flooded more than 46 rivers, and the maximum super -police range is 0.01 to 3.83 meters. At present, the No. 2 flood and Hongfeng of Xijiang is passing through the Deqing River section of Zhaoqing, Guangdong. The Guiping River section and the Pingnan to Duchengjiang section are still 0.03 to 1.98 meters.

In response to the flood conditions of the Pearl River Basin, Li Guoying, deputy commander of the National Defense General Defense and Minister of Water Resources, requested all the defense work. The Ministry of Water Conservancy launched a flood defense level IV emergency response, rolled the daily rolling of business judgments, strengthened monitoring and early warning and emergency duty, strengthened reservoir scheduling and flood limits of water level supervision, and implemented various defense measures. The Pearl River Water Conservancy Committee of the Ministry of Water Resources launched a level III emergency response to the water -drought disaster defense, scientifically dispatching the backbone reservoir of the basin, giving full play to the role of flood blocking, and reducing the pressure of downstream flood prevention; timely issuing notice, guiding the local reservoir safety flood, small and medium rivers floods floods, floods of small and medium rivers, He and the flood disaster defense and other work; dispatched three inspection teams to inspect unannounced inspections to compact the responsibility for flood prevention. Liu Ning, Secretary of the Party Committee of the Guangxi Zhuang Autonomous Region, presided over the Chamber of Commerce of the Defense Dispatch to arrange the deployment of flood defense; the Water Resources Department of the Autonomous Region launched a level III emergency response from the water, drought disaster defense, and sent 6 working groups to Liuzhou, Guilin, Wuzhou, Guigang, Hezhou, and guests. Guide local defense work well.

The Ministry of Water Conservancy will continue to pay close attention to the development of rainwater and flood conditions in the Pearl River Basin, strengthen discussions and judges, and do their best to do various defense work.

Source: Department of Water and Disaster Disaster Defense Department of the Ministry of Water Resources

- END -

Changchun Rail Transit Line 3 operation time is adjusted to 6: 00-19: 00

Due to construction needs, since June 20, the operating time of Changchun Rail Transit Line 3 is adjusted to 6: 00-19: 00.Passengers enter the station and take the whole process to standardize the hoo

Gao Mi Chaigou Town Multiple measures to strengthen social management and control

In order to further strictly control the public security and control of social fac...