awesome!Guigang Jingang Avenue Tongji Jiaoling Bridge realizes the bottom of the bridge, and the entire online traffic is on

Author:Guigang Daily Time:2022.06.29

awesome!

Golden Port Avenue Tongji Jiaoling Bridge is opened to traffic

Current

The entire line is open to traffic

On the afternoon of June 28, Xiao Xuan saw on the section of Tongji Jiaotongqiao Road on Jingang Avenue that the enclosure at the bottom of the bridge had been demolished and the road became much spacious. Earlier, the bottom of the bridge has always been closed, the vehicles can only be detour, the roads on both sides are crowded, and the driving is very slow.

Yang Zhongwen, the production manager of the Tongji Bridge Project of Jingang Avenue, told Xiaoxuan that on the morning of June 28, the construction staff had demolished the fence of the bridge, cleaned the construction waste on the site, cleaned the road, and prepared for the opening of traffic. It is reported that after the opening of the main bridge at the left and right sides of the main bridge will greatly alleviate the traffic pressure on the section.

At present, the Tongji Road will be closed for safety islands. After the completion, the entire section of the bridge will be unimpeded.

Xiaoxuan came to the Tongji Avenue overpass bridge with the staff to see that the two paving machines worked in an orderly manner.

"At present, the laying of asphalt paving of the bridge deck has been completed. Next, the plan is planned to install and pour the steel fiber concrete of the left ejaculation seam on the main bridge. The ministry and various construction teams have been working overtime. It is expected that the goal of opening the entire line in mid -July this year can be achieved. "Zhonghui, director of the project, said.

Further reading ↓

The Tongji Jiaotong Bridge Project of Jingang Avenue is located at the intersection of Jingang Avenue and Tongji Avenue. It connects the east elevated bridge of the eastern section of the Jinang Avenue and spans Tongji east. The ramp is about 225 meters long and 8 meters wide, and the total investment of the project is about 179 million yuan. This project is an important node to connect G80 high -speed channels and Guigang high -speed rail stations. It forms a three -dimensional transportation system with the Jinang Avenue system with the Golden Port East Everbright and the high -speed rail area.


The Propaganda Department of the CPC Guigang Municipal Committee hosted the Guidance Office of the Guigang Municipal Committee of the Guigang Municipal Party Committee

Produced by Guigang Daily/Guigang News Network

Content source 创 Original

Picture Video 熊 Xiong Yaozhang

Editing Xiong Yaozhang

School counterparts: Chen Lei Huang Guomin

Duty editor 英 Luo Ying

Duty head teacher, Xie Jingxiang

- END -

Guangdong's "employment promotion" to implement people's livelihood, and the bailout policy is expected to reduce the burden on the enterprise by about 50 billion yuan throughout the year

Zheng Wei, a reporter from Southern Finance and Economics, reported that recently, the General Office of the State Council issued a notification to complete the tasks of implementing employment priori

Kangxian Meteorological Observatory issued a thunder and yellow warning signal

Kangxian Meteorological Observatory issued a thunderbolt yellow warning signal at 14:01 on June 08, 2022: It is expected that this afternoon to the night, Tai Shi Township, Zhoujiaba Town, Pingluo Tow