Yellowstone does not relax and builds a flood prevention and safe embankment

Author:Dongchu Evening News Time:2022.07.01

On June 30, Deputy Mayor Li Wenbo went to the Yangtze River Division to supervise the flood prevention work and carry out protective forest inspections.

Li Wenbo went to the Kiln section of the Yangtze River along the Kiln section of the Yangtze River Avenue and the Cisse Petroleum Database During the supervision of flood prevention work, checked the construction of the flood prevention wall of the Shangyao section, and heard the relevant person in charge of the recent Yangtze River water level, flood prevention standards and related flood prevention work.Report.At the 222 flood control warehouse, the reserves of the flood control materials were learned, and the flood prevention preparation work of Hekou Wharf and Haikou Lake Pump Station were inspected, and the protection of forests along the river.

Li Wenbo emphasized that the flood season is not over, and the Yangtze River Dry and Pumping Station should strengthen the duty during the flood period; professionals must not be relaxed to the dykes and investigations, and the emergency measures for flood prevention must be implemented;The awareness and preparation of the prevention of the disaster cannot be taken lightly.Regarding the historical issues of the Hekou Wharf, all departments must clarify their duties, implement solutions as soon as possible, and accelerate the green and recovering forest along the Yangtze River.

Reporter Wen Hongling

- END -