"Graving time" and "increasing capacity"!The production capacity of these enterp

Author:Shanghai Putuo Time:2022.06.13

"Recruiting new employees and adding a new production line." As a leading manufacturing company in the Future Island Park in Putuo District, Shanghai Schneider Industrial Control Co., Ltd. (later referred to as "Schneider Industrial Control") Essence

“尽管上海的疫情耽误了两个月的工期,但我们的订单不减,复工以来,在全力赶工之余,预计今年的产值同比去年还能实现正增长。”施耐德工控总经理乔卫新告诉记者, Based on the development of Taipu Town, Putuo District, Shanghai and Zhagen, it is still full.

In the workshop of Schneider Industrial Control

Open "horsepower" and give priority to "guarantee production"

In special periods, in the future island parks, companies with such confidence in such confidence are far more than Schneider.

The reporter learned that since Shanghai has gradually resumed the normal production and life order on June 1, the park has opened up "horsepower" on the road to serving the company's resumption and running out of acceleration. "There are many manufacturing enterprises in the park. For the production line of the clock, home office means the postponement of orders and the shutdown of business." In the future, the relevant person in charge of the island park told reporters that in this way, the service guarantee enterprise resumption of work, the park is in the park, and the park is in the park. Concentrate strength and priority to "guarantee production".

Dako Electronics (Shanghai) Co., Ltd. (later referred to as "Dako Electronics") is the management headquarters and production R & D base of Dico company in the Asia -Pacific region. During the epidemic, there were only more than ten warehouse managers on duty. Since the expansion of the resumption surface on June 1, the re -production line of its production line has been close to 85%. "Less than half a month of resumption of work, now our order volume has reached the level before the epidemic." Yuan Hao, general manager of Dako Electronics, told reporters: "Actually, as early as in mid -to -late May, the company The order comes, and the confidence of development has returned. "

Dako Electronics's production line

According to reports, as of June 10, the re -work rate of the park's enterprise reached 97.5%. Among them, the average re -work rate of employees of manufacturing enterprises reached 99%.

The park has "horsepower" in service and guarantee, and enterprises also simultaneously opened the "full load" grabbing time and rushing mode in production and operation.

In the production workshop of Dako Electronics, workers in the morning and evening shifts started to ensure that the 24 -hour production line was "non -stop" and fully chased the delayed order construction period. In Schneider's production workshop, all the front -line workers arrived in the job, and the 24 -hour class fell in three shifts. "Not only that, in order to ensure safety production, we are still on the basis of 72 hours of nucleic acid negative reports, and add antigen test before going to job daily." In Qiao Weixin, epidemic prevention safety is the first "vitality" of the production line. Assure.

Schneider Industrial Control Line on the production line

According to reports, in the normalization stage of the epidemic, in order to ensure the production of "full load operation", in addition to "tailor -made" normalized nucleic acid samples for the enterprise in the future, the staff of the island park have also formed the "daily tour and day inspection Epidemic Prevention Inspection Class ": The park staff contracted to the implementation arrangements of the 12 specific contents of the enterprise's epidemic prevention system, place, personnel, logistics, and space, and do a good job of epidemic prevention guarantee and service in special periods.

Add "investment" and "expand capacity" against the trend

Before June 1st, due to the epidemic, Schneider's control settled the construction period of a number of orders, but this did not affect the addition of new orders. Qiao Weixin told reporters that as of a few days ago, the company's order volume increased by 8%year -on -year.

The demand for the market has not stopped, and the development of enterprises naturally keeps with it.

In addition to the full efforts, Schneider Industrial Control also added new investment, which will increase by 100%over last year. "On the one hand, we have added new production lines and will be put into use in mid -June and the second half of the year. It is expected to increase the Nissan capacity of 10%. On the other hand, we also accelerate the automation transformation and new technology applications. New technologies such as production lines and robots are put into use as soon as possible. "Qiao Weixin introduced.

New production line added by Schneider Industrial Control

In addition to increasing investment in material "hard assets", Schneider Industrial Control has also increased investment in human "soft assets". Less than a week after the full resumption of work, the company opened a new recruitment plan. On June 8, the first new employee had entered the factory for interviews. "In the training of personnel's echelon, the park has also helped us a lot, strengthening our confidence here." Qiao Weixin recalled: "Before the epidemic, the park was helping us to connect with the application project of the employment trainee base. Because the epidemic is put on hold, we haven't remembered this after the resumption of work. The staff of the park began to find us and started to restart this project. "

Not only is Schneider Industrial Control, Dako Electronics is also investing in capacity to expand capacity. On June 9, the company's newly arrived batch of machines were debugging and installation. "The advantage of Shanghai's supply chain is obvious, not only in time and rapid price, but also very competitive. The confidence in development. "Yuan Hao told reporters that the new production line is expected to be officially put into use in late June, and the production capacity will be increased by about 20%.

New production line set up by Dako Electronics

- END -

40 ℃!This year's largest and strongest high temperature is here, please pay attention to safety!

With the evacuation of the cold vortexLiangxia experience card is about to expireA...

Dance Steel Meteorological ORC to relieve high -temperature orange warning [level/severe]

Dance Steel Meteorological Observatory, June 08, 2022, at 19:53, the high -temperature orange warning signal released by Wu Gang City Meteorological Station at 11:22 on June 08, 2022.