When wearing "flood" and the northern row people are at a critical moment, it is apparent to

Author:Beijing released Time:2022.07.04

Since June 25, Beijing has been frequently rained and accompanied by strong convection weather for many consecutive days. The flood situation is the order, and the responsibility is more important than Taishan. Faced with the heavy rainfall of a raid, Beijing Drainage Group heard the "flood" and actively took effective measures to do a good job of flood control work. Ability and strong responsibility to protect the safety of drainage of Beijing cities.

At midnight on June 26, the flood control personnel inspected the rain well in Jinanqiao District.

On the evening of June 26, the flood prevention personnel of the regenerative water plant conducted a pre -rain inspection.

On the morning of June 27, the flood control personnel cleaned the water area near Beijing Station.

At midnight on June 28, the staff of the Qinghe Renewal Water Plant inspected the cable well.

At midnight on June 28, flood control personnel dispose of water near Jingtong Road.

At midnight on June 28, the flood control personnel disposed of accumulated water near Fuchengmen Bridge.

On June 28, the midnight flood prevention personnel used waterwheels to dredge the rainwater dumplings at the mouth of the subway station at Changchun Street.

At midnight on June 30, flood control personnel dispose of water at the West Bridge of Guangying.

In the process of cope with the rainfall, the leaders and leaders of the group at all levels of the group went deep into the front line and reached the leading command; party organizations at all levels and the majority of party members and cadres practiced their original mission in the wind and rain, showed the true nature of party members in the action, and insisted on the wind and rain. Fighting on the front line of flood prevention and rescue has made due contributions to urban safety floods.

In the early morning of July 1, flood control personnel drawn homework near Yuezhuang Bridge.

In the early morning of July 1, the flood control personnel were guided by the vicinity of Yue Gongzhuang Bridge.

On the morning of July 1, flood control personnel services were passed by passersby on the south road of the college.

On the morning of July 1, the busy overnight flood control personnel ate breakfast on the roadside.

The Beijing Drainage Group keeps in mind the lofty mission and responsibilities of ensuring the safe operation of the city, allowing the party flag to fluttering in the front line of flood prevention, and continue to fight for the best state, the highest standard, and the strictest requirements. The victory of the annual flood prevention guarantee!

- END -

The son -in -law fried futures pit father -in -law half 100 million, followed!Securities Regulatory Bureau: 500,000 yuan for fine ham

After the salesman of the gold ham (002515.SZ), the company's account was lost by ...

Australian media maliciously interpreted Vanuatu to support China

[Global Times Special Correspondent in Australia, Daqiao] The Australian News said on the 20th that the Pacific island country Vanuatu and Papua New Guinea, Solomon Islands and Kiribas support their s