Our province arranges to deploy strong rainfall prevention prevention work

Author:Shanxi Daily New Media Time:2022.07.11

On July 11, Taiyuan suffered heavy rainfall, and the traffic police stood in the water to guide traffic.

Fan Zhen, a reporter from Shanxi Daily, reports that at present, our province is about to enter a critical period of flood prevention in the "seven or eight". According to the meteorological department forecast, from July 11th to 13th, a large -scale rainfall process will occur in our province. In order to do a good job of preventing rainfall prevention and ensuring the safety of the lives of the people, the Provincial Water Resources Department issued the "Notice on Doing a Recent Recently Strong Rainfall Prevention Work" (hereinafter referred to as the "Notice"), requiring all levels and all levels Relevant units should attach great importance to it, resolutely overcome paralysis thoughts and fluke psychology, quickly arrange to implement preventive measures, and do their best to do a good job in the recent heavy rainfall prevention work.

The "Notice" requires to resolutely compact the responsibility for flood prevention. Leading cadres at all levels and levels at all levels must adhere to the people's supremacy, life first, compact responsibilities, perform their duties seriously, grasp various defensive measures, play chess first, and take the initiative to ensure the people of the people to ensure the people of the people. life safety.

Second, we must strengthen the "four pre -pre -" defense measures. In accordance with the "four pre -pre -pre -pre -pre -pre -pre -pre -based" requirements of forecasting, early warning, preview, and plan, we must strengthen the research and judgment of the water and rain rolling rolling conference, and release early warning information in a timely manner. It is necessary to improve the warning release mechanism, do a good job of warning and issuance of rivers floods and flood disasters, and issue early warning to the relevant departments and regions that may be affected in a timely manner.

Third, we must do a good job of scientific dispatching of reservoir stasis dams and scientific scientific dispatching of water engineering. We must conscientiously implement the "three responsible persons" and "three key links" of the reservoir. Large and medium -sized reservoirs must strictly standardize operations, and it is strictly forbidden to exceed the flood limits of water levels without authorization. Small reservoirs should implement a 24 -hour inspection defense to achieve "pre -rain investigation, inspection in the rain, and inspection after the rain." Each of the projects and silt dams must be inspected and emergency rescue measures to ensure the safety of the project. It is necessary to scientifically dispatch the reservoir, highlight the efficient operation of the reservoir, strengthen the joint scheduling of flood control in the watershed water engineering, and give full play to the role of reservoir flood, peak cutting, and peaks.

Fourth, we must prevent floods and flood disasters of small and medium rivers. It is necessary to strengthen measures such as the super -police super -guarantee small and medium -sized rivers, monitoring and early warnings, and personnel transfer of risk aversion, pay close attention to the key defense zone of the flood disaster and heavy rainfall area, and timely release the early warning information of the flood disaster. It is necessary to give full play to the role of a group combination and group testing system, so as to "measure accurate, direction, and run fast" to ensure the safety of the lives and property of the people.

Fifth, we must strengthen duty on duty and information reporting. It is necessary to resolutely implement the 24 -hour duty and leadership system, and the main leaders of the water conservancy departments of the municipalities in the rainy area should be in place and on -site command, and timely report to the flood, danger, and disaster information.

Sixth, we must strengthen departmental cooperation and cooperation. It is necessary to improve the communication and cooperation mechanism, strengthen the coordination and cooperation with the meteorological, hydrology, emergency and other departments, strengthen the sharing of federations and information, and organically connect with the "measurement and prevention newspaper" and "anti -rescue". Water conservancy departments at all levels should give full play to their professional and technical advantages, provide real -time rainwater information information and flood conditions forecasting results in a timely manner. The emergency department is requested to pre -inspect the rescue forces and supplies in advance, organize emergency rescue and rescue in a timely manner, and do a good job of flood prevention work together to form flood prevention work. Disaster reduction is strong.

On the morning of July 11, the Provincial Department of Water Conservancy held the province's water -drought disaster defense video dispatch meeting, and connected 11 cities with water conservancy departments to report the recent heavy rainfall situation and further discuss and deploy the prevention of rainfall prevention. After the meeting, the Provincial Department of Water Resources immediately sent two work guidance teams to Lu Liang and Jinzhong to carry out flood control inspection and guidance.

Edit: Shen Xinrui

- END -

Mai Gang City fully guarantee the supply of supplies during the prevention and control of the epidemic.

Ping Ping Merchants Reporter Yang DekunRice and flour inventory can be sold for 39...

Today at 0-17, a newly added case of the soil in Shanghai and 2 cases of infected infected with two symptoms of the soil

Today (11th), the Shanghai outbreak prevention and control press conference was reported in the afternoon. Today, at 0-17 today, one of the newly added cases in Shanghai and 2 cases of infected infect