it is true!The train channel of Zhaoqing College will change the culvert, the construction time is .

Author:Xijiang Daily Time:2022.06.14

Xijiang Daily reporter Yang Yongxin

Recently, the news of "Zhaoqing College's entrance is about to be demolished and built a new culvert" has aroused widespread attention from citizens.

What is the situation? Xi Jiangjun knows clearly for everyone, let's take a look at ↓↓

To build a culvert with Daokou in Zhaoqing College? it is true!

On June 12, the reporter learned from the Zhaoqing City Transportation Bureau that the Daokou Pingjian Project in the Guangmao Line Zhaoqing College in Duanzhou will be constructed next month. After the project is completed, pedestrians and non -motorized vehicles will travel from Xinhan Cave and prohibit motor vehicles from passing. At that time, the past trains will reduce the whistle, and the school teachers and students and surrounding residents will be quiet.

Why build a culvert?

At present, the average of Zhaoqing College pass through the passenger car 32 and 34 trucks daily. Daokou is only a hundred meters away from the school, and teachers and students and vehicles are busy. This is also the main traffic intersection to Beiling Mountain Forest Park.

△ Information picture

According to statistics from the railway department, from Monday to Friday in recent years, there are about 3,500 vehicles passing through the road daily. The highest peaks on the daily and holidays on weekends and holidays have reached 6,500 times. Due to the driving of some vehicles, traffic congestion is often caused by the traffic congestion and danger. Since January 2015, more than 10 traffic accidents have occurred in the road, and there are large hidden safety hazards.

How to build Handong? What will happen to travel?

It is understood that the Daokou renovation plan of the Zhaoqing College is to build two 4 -meter -wide × 3 -meter -high pedestrian traffic cave on both sides of the existing road. Non -motorized vehicles are through from Handong.

At the same time, the road will ban motor vehicles from passing. In the past, the car will be changed to Xiangyang Road Caton on the west, or the culvert near the east side of the agile · Shui Ying Lan Mountain Real Estate.

The total investment of the project is about 18 million yuan. The existing Daokou is retained, and it is usually closed. In case of heavy events or sudden natural disasters, use can be opened and used under the premise of implementing safety control measures. After the project transformation is completed, the safety hazards of the railway entrance will be effectively eliminated, the safety of railway operations will be ensured, and a good transportation environment will be created for teachers and students and surrounding people for Zhaoqing College.

At the same time, after the Daokou completes the transformation, the frequency of the trains will be greatly reduced, reducing the interference of the trains noise to the surrounding people.

When will the project complete?

According to the information provided by the Municipal Transportation Bureau, the railway department has completed construction bidding on May 7 and is preparing before construction. The project will start to surround the construction after the holidays in Zhaoqing College in July, and the planned construction period is planned for 1 year.

The pipeline relocation work is underway, and it will be completed before the construction of the project to ensure that it does not affect the progress of the project.

The masses have liked the project

After learning about this news, the teachers and students of Zhaoqing College and nearby residents praised their hands.

Xie Huilin, a student of Zhaoqing College:

"The trains will disturb their dreams late at night, and the trains will be greatly reduced in the future, very happy."

Teacher Su Zhaoqing College:

"This is a Limin project, which not only solves traffic jams and eliminates noise. Residents living nearby are even more happy."

Surrounding residents Cheng Jianjian:

"Without noise, our life will be quiet and comfortable."

- END -

Tribute to the anti -drug hero!Their photos need not play mosaic ...

Facing the poor drug dealers, the anti -drug police are not afraid. They use their...

Qingshui County Meteorological Observatory lifted lightning yellow warning signal

At 07:36, June 09, 2022, at 07:36, 2022, at 20:43, 2022, the lightning yellow warning signal released by 2022.