By 2025, the new buildings in my country's urban and towns will fully implement the standard of green building

Author:Xinhuanet Time:2022.07.14

Xinhua News Agency, Beijing, July 13 (Reporter Wang Youling) The reporter learned from the Ministry of Housing and Urban -Rural Development on the 13th that by 2025, the new buildings in my country's urban and towns will fully implement green building standards. Star green buildings account The government's investment in public welfare public buildings and large public buildings all reach one star.

The Ministry of Housing and Urban -Rural Development and the National Development and Reform Commission have recently issued the implementation plan for carbon peaks in the urban and rural construction fields. The embodiment proposes that before 2030, the carbon emissions in the urban and rural construction field reached the peak. The urban and rural construction green low -carbon development policy system and institutional mechanism are basically established.

According to the implementation plan, before 2030, the level of energy saving and garbage resources and utilization of construction has been greatly improved, and the efficiency of energy resource utilization has reached the international advanced level; the energy structure and method are more optimized, and the renewable energy application is more sufficient; the urban and rural construction methods are green and low carbon. The transformation has made positive progress, and "a large number of construction, a large amount of consumption, and a large amount of emissions" basically reverses; the overall, systemic, and growth of the city is enhanced, and the problem of "urban diseases" is initially resolved.

In terms of building green and low -carbon cities, it is necessary to optimize the urban structure and layout. Actively carry out the construction of green low -carbon cities and promote the development of group -type. The area of ​​each group does not exceed 50 square kilometers. In principle, the average population density in the group does not exceed 10,000 per square kilometer per square kilometer, and the maximum of up to 15,000 people per square kilometer in individual areas. Strictly control the newly -built super high -rise buildings, generally not to build super high -rise houses.

At the same time, strictly have existing construction demolition management, and insist on from "demolition and retention" to "retaining and disassembly" to promote urban renewal. Except for illegal buildings and professional institutions as dangerous houses and have no repairs and reserved value, they are not large -scale and successful. The concentrated demolition of the current building, the urban renewal unit (area) or the demolition of the building area in the project should not be greater than 20%of the total building area in principle. Normally survive houses and reduce various types of vacant houses.

The implementation plan also proposes to carry out the construction of green and low -carbon counties to build a county -oriented county pattern with intensive conservation and scale. The height of the building should be matched with the fire rescue capabilities. The new residential buildings are mainly 6 floors, with a maximum of not more than 18 floors. It should be strictly fully demonstrated and ensured that fire emergency and municipal supporting facilities are in place.

- END -

Tongren City reported 5 cases of party members and leading cadres drunk driving

Recently, the Tongren Discipline Inspection Commission will notify the drunk drunk...

On June 19th, the national logistics insurance promotion is unobstructed.

According to the monitoring data of the Office of the State Council ’s Logistics ...