By 2025, the water -saving system and mechanism will be basically improved!Shanxi starts to start the Yellow River Basin's deep water saving water control and control battle

Author:Published by Shanxi Time:2022.07.14

On July 12, news came from the Provincial Department of Water Resources. Shanxi recently issued the "Implementation Plan for the In -depth Water Conservation and Water Control of the Yellow River Basin in Shanxi Province" (hereinafter referred to as the "Implementation Plan"). Take water resources as the maximum rigid constraint, resolutely suppress unreasonable water demand, and deeply carry out water -saving and controlling water.

The "Implementation Plan" clearly states that by 2025, the water -saving system and mechanism will be basically improved, and a new pattern of coordinated development with the economy and society will be gradually achieved.

86 counties (cities, districts) in the Yellow River Basin of the province control the total water for less than 6.26 billion cubic meters, and the amount of water consumption and 10%of the industrial value -added of 10%and 10%respectively from 2020 respectively. , The effective utilization coefficient of farmland irrigation water is increased to 0.580;

The utilization rate of urban regeneration water reaches more than 25%, and the leakage rate of the urban public water supply pipe network is controlled within 9%;

More than 90%of county (city, district) administrative regions have reached water -saving social standards.

The "Implementation Plan" from strengthening the intensity control of the total water consumption, the implementation of agricultural water -saving increase, in -depth implementation of industrial water -saving and emission reduction, in -depth implementation of urban and rural life water saving, accelerating the use of unconventional water sources, strict use of water units supervision and management, deepening water conservation Eight aspects of the reform of the system and mechanism and extensive water -saving publicity and education are proposed to propose specific water -saving measures and key tasks in the year, and the plan implementation guarantee measures are proposed.

The "Implementation Plan" emphasizes that we must give full play to the role of the joint meeting system of saving water use department, and implement a departmental meeting system for major problems in water -saving and water -controlling work. In accordance with the functions of various departments and the key tasks of the "National Water Conservation Action Shanxi Implementation Plan", the "Fourteenth Five -Year Plan" period of the "Fourteenth Five -Year Plan" period was formulated. The task responsibility of the department shall implement a single management of key tasks.

Source | Shanxi Daily

Edit | Luo Li

- END -

The video of "Xi'an Street" video, the latest notice of the police

Today, a video called 7.15 Xi'an Street Baseball Sticks violently beating others h...

Tianshui Meteorological Observatory lifted lightning yellow warning signal

Tianshui Meteorological Observatory, June 09, 2022, at 05:32, at 18:10 on June 08, 2022, at 18:10, a lightning yellow warning signal released by at 18:10.