There is no need to wait for the train in front of Zhaoqing College!The way of car and pedestrians w

Author:Zhaoqing released Time:2022.06.14

good news,

There is no need to wait for the train in front of Zhaoqing College!

Zhaoqing College's Daokou Pingjin Project will be constructed next month.

The following scene may be rarely seen ~

△ Figure Yuan Zhaoqing Xijiang.com

The reporter learned from the Zhaoqing City Transportation Bureau that the Daokou Pingjin Reform Project in the Guangmao Line Zhaoqing College in Duanzhou will be constructed next month. After the project is completed, pedestrians and non -motorized vehicles will be worn by Handong. At the same time, motor vehicles are prohibited. Take the culvert near Yayang Road or Yishui. At that time, the past trains will reduce the whistle, and the life of the school and the surrounding residents will be quiet.

At present, there are people on duty for 24 hours of Zhaoqing College. When the train is about to pass, the staff on duty will put the railings to block the warning. On average, the average passenger car is 32 and the truck is 34. Daokou is only more than 100 meters away from the school. Teachers and students and vehicles are busy in and out. When the citizens drive to Beiling Mountain Forest Park, this is also the main traffic intersection.

According to the statistics of the railway department in recent years, there are about 3,500 vehicles passing through the road daily from Monday to Friday. On weekends and holidays, the daily vehicles passing through the road daily reached 6,500 times. Daokou traffic congestion, danger. Since January 2015, there have been more than a dozen traffic accidents that have occurred in the road, and there are large hidden safety hazards.

△ Figure source network

The renovation plan of the railway entrance

Two new 4 -meter -wide × 3 -meter tall traffic culverts are built on both sides of the existing road. The U -shaped slot is a barrier -free ramp, that is, digging culverts under the entrance, and pedestrians and non -motorized vehicles through the culvert. At the same time, the road will ban motor vehicles from passing. In the past, cars will be changed to Xiangyang Road Caton on the west, or the culvert near the east side of the agile water.

The existing Daokou is retained, and it is usually closed. If a major event or a sudden natural disaster occur, it can be opened and used under the premise of implementing safety control measures. After the project transformation is completed, the safety hazards of the railway entrance will be effectively eliminated, the safety of railway operations will be ensured, and a good transportation environment will be created for teachers and students and surrounding people for Zhaoqing College. At the same time, after the Daokou completes the transformation, the frequency of the trains will be greatly reduced, reducing the interference of the trains noise to the surrounding people.

After learning this news,

Teachers and students and nearby residents of Zhaoqing College

Nothing to praise.

Hong Ziqing, a student of Zhaoqing College, said: "The most worried about the traffic jam of Daocou, sometimes catching the high -speed rail, because the traffic jam is too long, it will affect the itinerary, and it is good to solve the problem of traffic jams."

Xie Huilin, a student of Zhaoqing College, said: "I just arrived at the school to hear the train whistle, but soon felt a noise. The whistle in the late night would disturb people's dreams. I hope to solve this problem as soon as possible."

△ Figure Yuan Zhaoqing College

According to the information provided by the Municipal Transportation Bureau, the railway department has completed the construction bidding on May 7th and is preparing before construction. The project will start underwriting construction after the holidays of Zhaoqing College in July, and the planned construction period is planned for 1 year. The relocation of pipelines is underway. Among them, the power supply pipeline has been temporarily relocated; the relocation of the gas pipeline is under construction, and the relocation work is completed before the construction of the project to ensure that the construction of the project does not affect the construction of the project.

Source: Duanzhou released WeChat public account

- END -

Two little bees ...

Text/Yang YunweiA primary school classmate said that there was a naughty words that I didn't know where they heard, which means that people looked after being drunk: No words, no two eyes, three meal...

Qingyang District and Italy Livano City concluded friendly and cooperative cities

On June 20, 2022, a special cloud signing ceremony was held in Qingyang District, ...