The "network" of the "network" of the weaving water governance has been evaluated by Jiangmen for 5 consecutive years

Author:Chinese overseas Chinese-Jiang Time:2022.07.15

Last year, the well -known proportion of the Water Examination and Provincial Examination Section of Heshan City remained 100%. Li Qianqian

Jiangmen Daily News (Reporter/Li Lei Correspondent/Mo Minling) was selected as pilot county projects in the national water system connection and water -American rural construction. "Typical cases of the provincial river and lake", a town -level river chief was named "National Excellent River (Lake)" ... Yesterday, the reporter learned from the Heshan City Water Resources Bureau that it was the work of the river and lake system in Heshan City. In Jiangmen City's 2021, it ranked first in the assessment of the long -term implementation of the river and lake system, and was awarded the excellent level.

In recent years, Heshan City has taken the construction of the provincial river long system demonstration county as the starting point to fully implement the dual -general river long system. The lake is responsible for his duties. Heshan also constructed the work chain of "River Everbright+River Head Assistant+River Sheriff+Folk River Everbright+River Inspector Calendar+River Bun Volunteer" work chain to further weave the "network" of the water. In 2021, the long -term river patrols of the river and lakes at all levels in the city of Heshan City found out and solved about 2,500 water -related problems.

Heshan has also continuously increased investment in water conservancy development. In 2021, it exceeded the full -caliber water conservancy investment of 933 million yuan to promote a number of people's livelihood water conservancy. The Xijiang embankment reinforcement and environmental improvement projects with a total investment of 611 million yuan have been completed, and the flood prevention standards for the embankment have reached 50 years. The comprehensive improvement of Shapinghe comprehensive rectification (second phase) project with pollution cutting and pollution is fully completed and accepted, and the operation is good. The second station of Shapinghe River Drainage was awarded the standardization and standardized management demonstration pump station in Guangdong Province.

Heshan also promotes Bi Dao Construction Project with a total investment of 480 million yuan in high quality. At present, it has completed about 440 million yuan to build about 35 kilometers. Essence

"We actively carry out the full -covered river and lake inspections, release the water environment 'red and black list' every month, and form a work mode of" real -time notification and Liqi Reform ". In 2021, more than 500 rectification issues have been implemented. Since the implementation of the river length system, Heshan has been rated excellent in the assessment of the river and lake system of Jiangmen City for five consecutive years, and has won the first place.

- END -

Airbus A350 plane has a serious corrosion paint, and there are hidden safety hazards in prosecution

Jimu News reporter Huang JiaqiDue to problems such as the surface paint of the A35...

Tianjin men's volleyball team signed new foreign aid!The 25 -year -old Serbian national player joined, and the new season has the strength to win the card

As the local men's volleyball team actively trained in Jiangmen, Guangdong, as a n...