[Chengxiang Civilization is not available for me] Road keeping flat drainage and smooth street lights

Author:Today Time:2022.07.16

Recently, the Urban Management Administrative Law Enforcement Bureau of Chengxiang District followed the requirements of the construction of the city to review and rectify the rectification tasks, and grasped the "hard standard" of municipal infrastructure construction. With the goal of "Luping, Lighting, and Drainage" The level of management, strive to create a clean, beautiful and harmonious urban living environment for the general public, and constantly build the foundation for the civilized city of our district.

Repair the damaged pavement and make the travel road flatter

In response to the problem of scattered roads and sidewalk damage points in urban areas, the bureau organized 30 people to set up a municipal facility inspection team to divide the two small teams to inspect, maintain, repair, demolish, repair the pavement, sidewalk asphalt, and sidewalk asphalt, as well as asphalt, and sidewalks, and Cement pavement damage and road stones defect. Since the beginning of this year, the bureau has investigated and rectified 88 municipal roads in the jurisdiction. At present, it has completed 5069 square meters of sidewalk repairs, asphalt pavement repair 3240 square meters, cement pavement repair 798 square meters, 91 renovation of Shipo, and 71 shaft covers. Realize the intact of the walkways and barrier -free trails and smoothly and smooth.

Fix the damaged pavement of Fenghuangshan Municipal Plaza

Maintenance facilities to make the drainage in the urban area more unobstructed

In response to many rainwater during the flood season this year, the bureau planned in advance before the flood season, carried out the reconstruction of the stagnant point, and accelerated the inspection of the hidden dangers of the rainwater pipe network and the hidden hazard of the rainhwater manhole cover. The professional dredging team is repaired and cleaned to ensure the normal operation of the rainwater pipeline. Since the beginning of this year, the bureau has completed 3,476 rainwater clearance, and the rainwater pipeline is cleaned up for 12 kilometers.

Dark Channel of the Court of the Yuancheng District Court of Xueyuan South Street

Dredging rainwater drainage

Fix the problem street lights to make night travel safer

The bureau organized a comprehensive night inspection of the street lights of the municipal departments to conduct a group and section of the roads under its jurisdiction, and timely discover damage or non -bright street lights, arranged in time, and repaired as soon as possible. Since the beginning of this year, there have been 76 switching boxes (control cabinets), about 1760 meters of fault cables, and 895 lack of light street lights, effectively ensuring the intact rate and lighting rate of urban street light facilities.

Fix the lack of street lights on the back lane

Fix the lack of bright street lights in Changcheng

Fix the street light fault cable

Source: Rong Media Center, Chengxiang District, Putian City

Edit: Lin Youming

- END -

More than 6000 square meters!The new exhibition area of Baoding Botanical Garden is "unveiled", come to play in midsummer!

Hebei Youth Daily (Reporter Sun Liang, a trainee, reporter Han Dongfang) Yuanhe fl...

Benxi Municipal Meteorological Bureau issued a thunderbolt yellow warning [Class III/heavier]

Lightning yellow warning signal: It is expected to have lightning weather in the city of Benxi on the afternoon of the 8th, and thunderbolt weather will appear in the city. At the same time, it may be