Provincial key project Chaoshan Ring Road Expressway Beijing Stove Bridge Project Construction Construction

Author:Yangcheng Evening News Yangche Time:2022.07.17

Text, Figure/Yangcheng Evening News all -media reporter Zhao Yingguang Correspondent He Xuanmei

On the afternoon of July 15, the provincial key project Guangdong Transportation Group's Chaoshan Ring Road Expressway Bridge project was approved by the overall land use of the project. At present, the project has obtained construction permits in accordance with the law, and construction has been fully started.

Effect map of Jingzao Bridge

It is reported that the total length of the Jingzao Bridge project of the Chaoshan Ring Road Expressway is about 3.11 kilometers. It starts from Xio Village, Guanbu Town, Chaoyang District, Chaoyang City, Shantou City. Highway intersection. The project has a golden stove (hub) interchange, crossing the Rongjiang River from the south to the north, and ends in Jingnan Village of Jieyang Airport Economic Zone. Essence

The main line of the project is designed and implemented according to the technical standards of the two -way six -lane highway, and the design speed is 80 kilometers per hour. A total of 2 bridges are set up across the line, 2 toll stations are set up, and construction is carried out in 2 bid sections. Among them, Jingzao Bridge is the control project of the entire project, which is about 1793 meters in length. The main bridge is the double tower and dual cable surface and the semi-floating system steel-concrete combination beam. The two main towers with a height of about 126 meters are located in Shantou and Jieyang.

Project construction site

At present, the construction of the project department's steel processing ground, concrete mixing station, and other Lin Construction projects have been completed. More than 400 construction personnel are promoted simultaneously in the pile foundation, soft base treatment, beam production, and lower part of the bridge. A total of 52 pile foundations in the two main piers of the bridge are about to be completed, laying a solid foundation for the fulfillment of the total construction period, and the "acceleration" of the project construction has been opened.

At present, the cross -strait exchanges between the Rongjiang River mainly rely on ferry transportation. After the completion of the Beijing -stove Bridge project, it will effectively solve the traffic needs of hundreds of thousands of people on both sides of the strait. The three cities of the "Shachali Jie" have an important role in the development of the same urbanization of the city.

Source | Yangcheng Evening News · Yangcheng School

Editor -in -law | Li Cheng

- END -

In the afternoon of the 6th, the precipitation in Shandong Province gradually weakened Weifang and Peninsula.

Qilu.com · Lightning News July 6th. Yesterday, most of the provinces appeared in...

"Party flags flutter at the grassroots level" Jinan: Boil the heatstroke prevention and cooling drinks to the front line

No fear of roasting to inspect sweat and stick toJinan: Boil the heatstroke prevention and cooling drinks to the front lineOn June 18, the ground temperature in Jinan City, Shandong Province approac