Use high differences to create a stepped landscape campus

Author:Luoyang Daily Time:2022.09.14

A few days ago, the construction project of the Fifth Senior Middle School in Luoyang City, located in the old city, ushered in an important node -the first high school in the city's 7 new high schools entered the pile foundation construction stage.

The reporter learned from the construction unit of the project construction unit.

The new campus of the Fifth Senior High School in Luoyang City is located in the Daobejialing District of Daobei Jialing in the old city area. It faces Longguang Road in the west and looks at the Cuiyunfeng Forest Park. It covers an area of ​​about 163 acres. Garage, experimental building, art building, 2 student dormitories, teachers apartments, gymnasiums, cafeterias, door guard rooms, pump houses and public supporting facilities.

According to reports, since the construction, the project headquarters has organized equipment, loader, road press, and other equipment to enter the market and constructed. More than 100,000 cubic meters of foundation pit excavation tasks in student dormitories, underground garages, teachers' apartments and other areas have been completed. , Long spiral drilling piles have completed 51 pile foundations. According to the plan, the overall civil engineering project will be completed by the end of this year, and the delivery will be achieved by the end of June next year to lay the foundation for the protection of teachers and students in September next year.

"Because the new campus of the Fifth Senior Middle School in Luoyang City is located in the Hill Hills District of Laoshan, the terrain is high in the north, and the school adopts the concept of the potential of the town to lay out a multi -floor platform to build a college -style high school with a staggered and poetic and paintings. "The relevant person in charge of the China Railway 15th Bureau Group said.

Highlight 1:

Follow the "Shushan Axis" and "Wangcui Axis" streamline layout

The new campus of the Fifth Senior High School in Luoyang City follows the regulations of traditional Chinese academies, inherit the artistic conception of traditional colleges, and divides the axis such as the "Shushan Axis" and "Wangcui Axis" for streamlined design. The layout structure of Zhang Chi has a low -degree and aperture; along the "Wang Cui axis", the building adopts the design of 3 to 4 floors, from high to low, and the scale is appropriate. Forest Park.

The school's main entrances and exits are combined with the north -south axis layout. Among them, the main entrance is the main entrance to the south side, the entrance and exit of the transferred students are available on the east side, and the east side entrances can also be used when the sports facilities are open to the public on holidays.

In the campus layout, a "teaching main street" in the interior is deliberately designed, combined with the "Shushan Axis" running through the campus north and south, connecting the main functional hall space, teaching group and underground passenger system of the schools. The two sides of the "Teaching Main Street" are arranged on both sides of the class, co -class, stairs, self -study, community and other public classrooms to achieve the maximum sharing and utilization of classroom resources.

Highlight 2:

Three -dimensional campus new ideas

Luoyang Fifth Senior Middle School's new campus has a height difference of nearly 20 meters. After completion, a stepped campus will be formed. The school also cleverly uses the height difference to create a unique three -dimensional student reading space, sinking outdoor theater and other shared functional sections, providing room for outdoor communication that is more popular with young people.

Considering that the west side of the school is Cuiyunfeng Forest Park, the three grades of teaching buildings are designed with 3 floors. The three groups are located on the west side of the three platforms. Unique urban three -dimensional interface.

The student dormitory courtyard on the north side of the campus is set up, public activity centers such as auditoriums, wind and rain fucking fields, etc. in the middle area, and 3 -story experimental building, administrative building and other functional groups on the south side to form a better three -dimensional image.

In addition, the school also sets up a dedicated landing area in the underground area of ​​the north dormitory. Combined with the sinking courtyard design, natural lighting and ventilation can be achieved, and the unity of functionality and landscape can be achieved. (Luo Bao Mercy Reporter Li Donghui Correspondent Zhang Yue)

Source: Luoyang Daily, September 14, 2022, 222

Edit: Guo Lixiang

- END -

Hong Kong University of Science and Technology (Guangzhou) ushered in the first freshman to report

JPEG Webkit-Playsinline At 9 am on August 20th, the Hong Kong University of Scie...

2022 Graduation MV: "New Star"

Video/Snapshot, T_100, F_JPG, M_fast Controls = Controls data-version/ueditor/vide...