Siyang, Jiangsu: "Flood" fast operation tighten the flood prevention "safety valve"

Author:Pioneer government Time:2022.07.27

"Is the flood prevention supplies be in place?" "According to the flood prevention requirements in the county, we prepared 350,000 woven bags, 5300 tons of stone, 64 cubic meters of wooden piles, 40,000 square meters of geotechnical cloth, 105 sets of machine pumps, rubber boats, and rubber boats 1 boat, 500 life jackets ... "At the flood control material warehouse of the electromechanical discharge management station, the disciplinary inspection cadres in Siyang County inspected the reserve of flood control materials on the spot. Since the end of June, since the main flood season, the Siyang County Commission for Discipline Inspection has increased the inspection and inspection of the flood season, conducted in -depth supervision of the front line, strictly disciplined the discipline of flood prevention work, and ensured that the measures for flood prevention work were fully implemented.

Clarify the target tasks and strictly control the responsibility. The County Discipline Inspection Commission established three inspection teams with the Water Resources Bureau to conduct investigations on hidden safety hazards in the county's small and medium -sized rivers, gates, and water conservancy projects. Concentrated inspection. For problems found during the investigation, uniformly establish a problem account, implement the "list system+responsibility system", and clarify the person in charge of rectification and the time limit for rectification.

Strengthen the construction of style and tighten discipline. Strengthen the construction of the ideological style of flood control staff through the requirements of meeting, warning education, and reminder. Adopt the method of "four nosy", focusing on checking the embankment, irrigation district, and water conservancy station strictly implementing 24 hours of duty and leadership -leading systems and dangerous information reports. Letter together, investigate and deal with.

Condenb the supervision and build a security net. Give full play to the effectiveness of the linkage supervision of the "room and land". Through the supervision and follow -up supervision, sink the supervision of the front line, and carry out the "three investigations and three views": check the deployment situation and see if the responsibility division is clear; See if the inland water system is unblocked; check the construction of the system, and see if the deployment of the higher level is in place.

Up to now, the county has carried out more than 10 flood prevention and flood preparation inspections, and found and promoted 12 rectification issues to ensure the safety of the people's lives and property with strong supervision.

(Shi Zhiqiao Liu Chang)

- END -

[Millions of Police Ten Thousands] Fuhai Public Security guards peace and happiness beside the masses

In order to further strengthen the comprehensive governance capacity of social sec...

Tap Water in Yaqiao Village, Longgang Town

I look forward to how many years I have been looking forward to the water. On the evening of June 30, Zheng Yingfu, a villager in Yaqiao Village, Longgang Town, Yangxin County, gently unscrewed the