Zhangzhou!my country's first cross -sea high -speed railway spreads through the line

Author:Straits Herald Da Zhangzhou Time:2022.09.01

August 30th

With the Fuxia High -speed Railway Xiamen North Station

The last group of 500 meters long rails

Successfully paved on the road bed

my country's first cross -sea high -speed rail-

Four -rails of Fuxia High -speed Railway Palentry

The newly -built Fuxia Railway Meizhou Bay Cross -sea Bridge (drone photo) was built on April 15, 2022. Xinhua News Agency reporter Zhou Yi Photo

Fuxia High -speed Rail north from Fuzhou

Passing through Putian, Quanzhou

Southern to Xiamen and Zhangzhou

Northern end connects the Fufu Railway, Wenfu Railway

Connect the Xiamen -Shenzhen Railway and Longxia Railway in the southern end

Design speed 350 kilometers per hour

The total length of the line is 277.42 kilometers

There are Fuzhou South, Fuqing West, Putian along the line

Quangang, Quanzhou East, Quanzhou South

Xiamen North and Zhangzhou 8 passenger stations

Strive to be completed and opened to traffic in the first half of next year

The entire bridge -tunnel ratio of the Fuxia High -speed Railway is as high as 84.3%, and there are technical problems such as difficulty in communicating communication, vehicle positioning and vehicle speed monitoring difficulties. To this end, the construction and construction unit uses the most advanced domestic layout comprehensive command scheduling system in China, and will be the most advanced layout of the gripping frame. Functions such as wireless network transmission and positioning navigation are integrated into the dispatch system, and the intelligence, informatization, and visual management of scheduling and command are realized.

Fuxia High Speed ​​Railway

Fuxia high -speed rail is the first domestic cross -sea high -speed railway

Design speed 350 kilometers per hour

The total length of the positive line is 277.42 kilometers

Cross

Meizhou Bay, Quanzhou Bay, and Anhai Bay 3 Gulf

There are 8 seats on the entire line

On November 13, 2021, the Meizhou Bay Cross -sea Bridge successfully combined the dragon

2023

After the Fugia High Speed ​​Rail is opened to traffic

Fuzhou and Xiamen will form a "one -hour life circle"

Xiamen, Zhangzhou, Quanzhou and other places

Form the "half -hour traffic circle"

The southeast coastal urban agglomeration will connect a series

"Gold Tourist Belt"

future

Fuxia High -speed Railway will also be Fuzhou and Xiamen Zhangquan

The acceleration of the two major metropolitan areas and the rise of the two major cities

Regional economic and social development along the line

Inject new kinetic energy

Come/Xiamen Radio and Television

Editor/Hong Tingting

- END -

Anzhen Hospital's Tongzhou Hospital at the end of the year appeared at the end of the year

In the construction of Anzhen Hospital, Tongzhou Hospital in the construction is e...

From 0:00 on the 21st to 14:00, 24 cases of new local diagnostic cases and 224 cases of no symptoms infected

On the afternoon of August 21, 2022, the 13th press conference of the new crown epidemic prevention and control work was held.Introduction to the spokesman of the Tibet Autonomous Region Government an