Traffic police tips: These vehicles should be detoured during the construction of Fuxing Street and the North Third Ring Road!

Author:Hebei Radio and Television Sta Time:2022.09.02

On August 2nd, the Transportation Administration of the Shijiazhuang City Public Security Bureau issued the "Notice on the Implementation of Temporary Deting Management on the Municipalization Reconstruction of the North Third Ring Road Road in Fuxing Street". The announcement stipulates that in order to ensure the safety of roads during the reconstruction of Fuxing Street and the Municipalization of the North Third Ring Road, to maximize the traffic accident and traffic congestion due to road construction, and a temporary detour of the medium -sized carrier and special operating vehicles. On September 1, the reporter conducted field inspections on the section of the notice and found that most truck drivers could consciously choose to detour according to the spirit of the notice. However, there are still some truck drivers who are still driving into the forbidden section in order to save money. The reporter interviewed Master Zhang, a truck driver who was persuaded to return to: Master, do you know the notice of temporary detour during the construction of the North Third Ring Road?

Master Zhang, a truck driver, said: I have seen it from Shijiazhuang Traffic Police WeChat public account.

Reporter: Then why do you have to ban the bank?

Master Zhang, a truck driver, said that if I want to go back to Tancheng, I have to go around Shihuang and have to pay the toll, which is not cost -effective!

The reporter asked another truck driver Li, and Li said: I have also seen a notice from the media. The road to Fuxing Street is nearly a dozen kilometers than bypassing the road.

In response to the above issues, the reporter contacted Guo Xinglong, the person in charge of the Third Ring Brigade of the Municipal Traffic Management Bureau. Consultation on the relevant issues. The temporary restrictions on this section are as summarized as follows:

1. What are the sections involved in the construction section?

Answer: 1. Fuxing Street (Shijiazhuang North Toll Station to Shijiazhuang South Toll Station) section, Luancheng entrance to the G308 connection line section;

2. North Third Ring Road (Shijiazhuang West Toll Station to East Third Ring Road North Five Women's Interoperability), East Third Ring Road, North Five Women's Interoperability to Shijiazhuang East Toll Station, and the entrance and exit of Shiqing Road in the North Third Ring Road to Shiqing Road connection line section;

3. Import and export ramps in the above section.

2. What is the time period of this temporary detour?

Answer: From August 7, 2022 to the end of the road section.

3. What are the temporary detouring routes?

Answer: 1. Expressway bypassing routes: Beijing -Hong Kong -Macao Expressway, Qingyin Expressway, Xibaipo Expressway, Jinshi Expressway, Beijing -Kunming Expressway, and North Wound Expressway.

2. The route of the country and provincial roads: G234 (Jingzan Line), S203 (No Fan Line), G338 (Zhenggang Line), X060 (Jingyuan Line), S337 (Hengjing Line), S204 (Xin Zhao Line), New Zhao Line), New Zhao Line) G515 (Dingjun line).

Fourth, regulations for bypassing coal transportation vehicles

Answer: Northern Transportation Channel: The northern part of Shijiazhuang City, a medium -sized cargo vehicle in the north of Shanxi and the west of Baoding, can be used to use the uniform coal transport vehicle auxiliary channel S203 (non -complex line) and G338 (Zhenggang Line) that can be uniformly determined by the Provincial Transportation Department. Xingtang, Xinle, Wuji, and Shenze passed the country to Huanghua Port.

Southern Transportation Channel: Shijiazhuang City's Southern Southern Xiangyang Medium -sized Cargo Vehicles can use the transit of G339 (Binyu Line) uniformly determined by the Provincial Transportation Department.

5. What are the provisions of vehicles such as emergency and people's livelihood protection that really need to enter the road section?

Answer: For emergency rescue, urban people's livelihood demand, urban logistics distribution, and high -quality cargo vehicles and special operating vehicles that need to enter the above sections, urban logistics distribution, and ensuring urban operations, according to the "Shijiazhuang City People's Government about the city issued on December 9, 2021, "Notice of District Road Pass Management" requires that the WeChat public account of Shijiazhuang Public Security Traffic Police WeChat, and handle the network through the WeChat/traffic management of the traffic management.

Shijiazhuang Traffic Police Tips: The municipal transformation of Fuxing Street and the North Third Ring Road is the move of benefiting the people. Please understand the majority of traffic participants to understand and support the work of public security and management, and plan the route reasonably before travel to avoid delaying illegal treatment of illegal delaying you. Precious time. At the same time, the traffic police also reminded the vehicles on the construction section to follow the law and sign the speed limit of the prompts.

- END -

Leslie Cheung's last New Year film was made here?

When the Guangzhou Metro Line 18 was opened last year, the circle of friends was h...

Traffic police enter the campus and send safety classes

Correspondent Yang Yanbing Shang MengdiAt 15:00 on September 5th, the traffic poli...