An Chengdu diary of a builder: In 3 days, we transformed the community service complex into a volunteer "big base camp" [Qi Xin war into Chengdu can do it]

Author:Cover news Time:2022.09.03

Cover Journalist Yang Lan

Saturday, Saturday, Saturday

Location: Jinyang Community, Liujiang Street, Jinjiang District, Chengdu

My name is Zhang Zilong, and I am the project leader of the Jinyang community comprehensive function of the China Wuye Group. In the past few days, the epidemic in Chengdu is "fierce", and a large number of volunteers work hard to work in the front line of Chengdu. It is important to ensure that volunteers rest and recover physical strength quickly. In the Jinyang community in Liujiang Street, Jinjiang District, Chengdu, there is one of the "base camps" that we have renovated a few days ago and for volunteer rest.

Project location

The "base camp" of the Jinyang community is usually a community service complex. In this round of Chengdu epidemic, under the premise of retaining basic functions, we have transformed a large number of living spaces for this to maximize the volunteer "physical and mental settlement".

Monitoring guarantee equipment debugging

At noon on August 29, the emergency project of the Jinyang community comprehensive function in the group received the notice from the superior. It is necessary to immediately debug the project air conditioning, water supply, lighting, monitoring, fire protection, etc. Volunteers from other places create comfortable conditions, and the fastest speed supports the prevention and control of the epidemic.

Relying on the emergency command system of Wuye headquarters, our project team organized more than 30 professionals such as fire protection, ventilation, decoration, civil construction, and the rectification of relevant professional equipment, quality defects, and doing a good job of cleaning and cleaning work. , Met the conditions for check -in immediately.

Power system debugging

By 16:00 on September 1, the project air conditioning, water supply, lighting, monitoring, fire protection can be used normally, and the tasks are successfully completed within 72 hours.

At present, the 2nd floor of the North Building provides 200 temporary beds and 250 temporary beds on the 3rd floor of the North Building, all of which are large spaces. The South Building can provide 150 temporary beds. A total of 600 temporary beds can be provided for volunteers for temporary living. Essence Everyone is very hard, and we do our best to make everyone live and replenish their physical strength. I believe that the epidemic will soon pass.

At 12 o'clock in the middle of the night yesterday (September 2), I saw that there were already 12 volunteers here for a break.

- END -

Leading of party building: towards the party, the "epidemic" line bravely responsible

In order to do a good job of preventing and controlling the epidemic and improving...

Shilin Yi Autonomous County Meteorological Observatory to lift lightning yellow warning [Class III/h

According to the latest weather, the Shilin County Meteorological Observatory was lifted at 22:04 on June 08, 2022 to remove the lightning yellow warning signal issued at 14:40 on June 8, 2022.