11 districts and cities have tasks!Zhejiang introduced the comprehensive work plan of "14th Five -Year Plan" energy conservation and emission reduction

Author:Published by Zhejiang Time:2022.09.09

In order to effectively do a good job of energy conservation and emission reduction in Zhejiang Province, the provincial government has recently issued the "Comprehensive Work Plan for Energy -saving and Emperor's Emissions and Eatsurding" in Zhejiang Province.

The "Plan" proposes that by 2025, the province's total product value of energy consumption will decrease 14.5 % compared with 2020, the total energy consumption will be reasonably controlled, the total coal consumption will decrease by about 5 % compared with 2020, and control is about 124 million tons. Nitrogen oxide, volatile organic matter, chemical oxygen demand, and key project reduction of ammonia nitrogen projects reached 55,500 tons, 47,600 tons, 54,300 tons, and 3,600 tons.

The "Plan" proposes that the key projects of energy conservation and emission reduction should be implemented, and a sound energy conservation and emission reduction policy and mechanism should be implemented. Let's learn together ~

Implementation of energy conservation and emission reduction key projects

Industrial energy -saving carbon reduction project

Carry out a new round of manufacturing "Teng cage changing birds, phoenix Nirvana", and the province eliminates more than 15,000 companies in the province and improves high -efficiency enterprises to improve high -efficiency enterprises. During the "Fourteenth Five -Year Plan" period, the value -added energy consumption of industrial units decreased by more than 16 % (after deducting the national single -column project), and the value of 10,000 yuan in industrial added value decreased by 18 %. By 2025, the proportion of energy -effective benchmarking level production capacity in key areas such as steel, building materials, petrochemicals, chemicals, and non -ferrous metals will reach 50 %.

Energy -saving environmental protection improvement project for major platforms

Implement the green low -carbon development operation operation in the park, and carry out the construction of "zero sewage zone", fresh parks and "non -waste cities". By 2025, the coverage rate of major platforms can reach 100 %, and 60 % of the provincial -level development zones (parks) at or above the provincial level will be built into a fresh park. Essence

Urban building energy conservation project

Comprehensively implement the concepts of green low -carbon planning, green design, and green construction management of urban buildings, and promote the construction of low -carbon cities, tough cities, and sponge cities. By 2025, the energy -saving rate of new public buildings and residential buildings in urban and towns will increase to more than 75 %, and the green building standards will be fully implemented.

Energy reduction project for traffic logistics festivals

Improve the new energyization rate of urban bus, rental, logistics and other transportation vehicles, and strengthen the promotion and application of ship cleaning energy. By 2025, vehicles in the public transportation field in the province's main urban area (except for emergency protection and special demand vehicles) have a new energyization rate of 80 %, and the province will update 40,000 diesel trucks in the old and old discharge standards below the four emissions standards of the country.

Agricultural and rural energy conservation and emission reduction project

Promote the application of solar energy and biomass energy in rural production and life according to local conditions, and improve the level of electrification of rural energy use. By 2025, the coverage rate of rural domestic sewage treatment administrative villages will reach 95 %, and strive to reach 95 % of the percentage of water, and the comprehensive utilization rate of straw is stable at more than 96 %. Essence

Public agency energy efficiency improvement project

Public institutions have existing green transformation of buildings and green transformation in response to the needs of office buildings, and encourage market -oriented models such as contract energy management and contract water conservation management. By 2025, more than 80 % of the province's county -level party and government agencies at or above the county level will build a conservation agency, and the proportion of coal consumption and green procurement of public institutions in the province will reach 80 %.

Pollutant emission reduction project in key areas

Focusing on the Hangzhou Bay area, it has implemented the in -depth particles and the "dual control and dual reduction" of fine particles and ozone, and vigorously promoted volatile organic objects and nitrogen oxidation associations to reduce emission reduction. By 2025, the realization of water pollutants in the transportation of inland river traffic in the province will be accepted.

Coal clean and efficient utilization project

Strictly control the growth of coal consumption, promote the "three reform linkages" of coal -saving coal reduction, heating transformation, and flexibility transformation of coal -to -electric units. By 2025, the proportion of non -fossil energy consumption will reach about 24 %.

Comprehensive rectification of volatile organic matter

Promote the replacement project of raw and auxiliary materials and product sources, and implement the entire process of pollutant treatment. By 2025, the proportion of solvent -based industrial coatings and inks will be reduced by 20 percentage points, 10 percentage points, respectively, and the use of solvent -type adhesives will be reduced by 20 %.

Environmental infrastructure level improvement project

Accelerate the construction of sewage, garbage, industrial hazardous waste, medical waste treatment and disposal facilities systems that meet the actual needs, and expand the coverage of environmental infrastructure. By 2025, all counties (cities, districts) will complete the construction of "zero -sewage zone" in urban and towns, and the reconstruction of the cleaning and discharge technology of urban domestic sewage treatment plants will be completed by 4 million tons/day, and the new urban sewage treatment capacity is 3 million tons/day. The new and transforming sewage pipe network is 4,000 kilometers, the incidental disposal rate of urban sludge has reached 95 %, and the urban domestic waste incineration treatment capacity accounts for about 65 %.

Improve energy conservation and emission reduction policy mechanism

Optimize energy consumption dual control system

Scientifically decompose the target of energy consumption strength in each district and cities, implement the two target management of the basic goals and incentive targets of energy consumption strength, and the reduction of energy consumption intensity to achieve incentive targets. The total energy consumption consumption is in the current energy consumption dual control assessment Remove assessment.

Improve the control system for total pollutants emissions

The total control system for pollutants is an important starting point for accelerating the development of green and low -carbon development and improving the level of environmental governance, and implemented key emission reduction projects. Optimize the decomposition of the total emission reducing index, reduce the emission reduction of key projects, and assume relatively large emission reduction tasks with heavy pollution control tasks.

Resolutely curb the blind development of the "two highs" project

Carry out the classification and disposal of the "two highs" projects, incorporate the "two highs" projects into the online monitoring system of key energy use units, and resolutely win the "two high" projects that do not meet the requirements. Strictly implement the new project unit industrial added value of 0.52 tons of standard coal/10,000 yuan energy efficiency standards, and strengthen the impact assessment of new projects on energy consumption dual control and review indicators for energy consumption. Make every effort to ensure the use of major projects

The main product energy efficiency reaches major industrial projects in the international advanced level, which can use the "Fourteenth Five -Year Plan" energy consumption index in the year. For major projects with the value -added energy consumption of the unit's industrial value of less than 0.52 tons, the green channel for energy -saving review is opened.

Improve regulations and standards

Promote the revision of local regulations and regulations such as the "Regulations on Ecological Environmental Protection of Zhejiang Province" and "Zhejiang Province Energy Conservation Supervision Measures". Make -up and revise energy -saving standards, and regularly release the "Guidelines for Industrial Efficiency of Zhejiang Province" to promote the significant improvement of energy efficiency in key industries.

Improve economic policy

Increase the financial support for energy conservation and emission reduction, make overall arrangements for special funds to support the construction of key projects for energy conservation and emission reduction, and increase energy consumption dual -control financial rewards and punishments. Increase the implementation of government green procurement. Accelerate the development of green bonds, and support qualified energy -saving emission reduction enterprises to list financing and refinancing. Continue to improve the green electricity price system such as the electricity price of high -energy industry ladder, and resolutely ban the unreasonable price support policies of the "two highs" projects.

Improve the marketization mechanism

In -depth development of the use of capacity for use and the reform of the trading system, formulate the method of confirming the energy consumption of the industry, iterate the upgrade of the power trading platform, and promote the aggregation of energy elements to high -quality projects, enterprises, and industries. In -depth promotion of market -oriented transactions of pollution rights, and gradually incorporating volatile organic objects into the scope of pollution -discharge transactions.

Strengthen the construction of statistical monitoring capabilities

Strictly implement the report system for the energy utilization of key energy -consuming units, improve the energy measurement system, and strengthen the construction and application of the energy consumption system of key energy consumption units. Strengthen the construction of grassroots statistical teams, strengthen statistical data review, and improve the quality of statistics.

Strengthen energy conservation and emission reduction capacity building

Taking the "big comprehensive integration" administrative law enforcement reform as a traction, the establishment and improvement of the energy -saving regulatory system and the capable law enforcement system can be established. The key energy unit sets up energy management positions and person in charge as required. Strengthen the construction of the county -level and township grass -roots ecological environment supervision teams, and set up full -time environmental protection personnel in key sewage units.

Strengthen energy conservation and emission reduction digital empowerment

It iterates to improve the energy -saving carbon -reduction E -book, dirt -cut carbon reduction online, etc., and promote the major application of energy conservation and emission reduction, and enhance the practical effectiveness. Establish a full -chain closed -loop management model for target decomposition, tracking monitoring, and evaluation, and improve the level of refined management of energy conservation and emission reduction targets.

Edit: Li Weimin

- END -

"Fire Rose" Yu Mei's story ①: Do not love red pretense and armed

There are many options for youth.In 1998, Dawu's girl Yu Meihuai entered the school admission notice, set foot on the train north, and came to the Langfang Armed Police Academy in Hebei to start a mil...

Grabing time, fighting rate, strict control -Shenshan Town, Lanling County, Shandong Province builds a grass -roots epidemic prevention barrier

The epidemic is command, and epidemic prevention is responsibility. Facing a sever...