"Western Power East Delivery" large artery UHV White Zhejiang Line smoothly crosses the Yangtze River

Author:Xinhuanet Time:2022.09.13

The Baihetan-Zhejiang ± 800 kV high-voltage DC transmission engineering in Jiangjin District, Chongqing City was shot on September 13th.

On the same day, after 13 consecutive days of continuous construction, the "Western East Percert" Baihetan-Zhejiang ± 800 kV high-voltage DC transmission project (White Zhejiang Line) successfully completed the Yangtze River leap-up operation.

The White Zhejiang Line is a major power grid project with the national "Western Power Delivery" and clean energy delivery. It passes through Sichuan, Chongqing, Hubei, Anhui, and Zhejiang. The line length is 2140 kilometers.Among them, the length of the Chongqing section line is 331.25 kilometers. The construction was launched in October 2021. It is planned to achieve the entire line at the end of September.

Xinhua News Agency reporter Liu Yan

- END -