Preventing urban waterlogging in Zhejiang 602 professional drainage teams, waiting for strictly

Author:Zhejiang Daily Time:2022.09.14

Zhejiang News Client reporter Fang Zhenzi Correspondent Li Minmin

On the evening of September 13th, the Ningbo garbage collection team grabbed the garbage overnight

On the morning of the 14th, the reporter learned from the Provincial Department of Construction that it brought urban waterlogging in the strict prevention of typhoon "plum blossoms", strengthening dynamic inspections of waterlogging areas across the province, and paying close attention to water accumulation.

As of 8 am, Zhejiang Province has accumulated a total of 28,888 person -times, 271 vehicles dispatched vehicles, investigated 2079 waterlogging areas, 163 urban tunnels, and 289 traffic jams are overwhelmed. After about 86,000 flood control materials, 162 hidden dangers have been eliminated; the province has investigated 1,148 underground garage in the residential area in the province, all of which have been implemented. equipment.

At present, our province has prepared flood control materials and teams. The competent drainage authorities in various places have implemented the reserve of flood prevention materials in advance. 602 professional drainage teams with a total of 10,606 people have been organized, and 305 high -power drainage pump trucks, 1680 emergency pumps, 352 engines and other facilities have been reserved to ensure that " Take it out and use it. "

The relevant provisions of the "five stops" work at the construction site also strictly implemented. There are 1,8837 municipal construction sites under construction in the province. There are currently 16,267 construction sites affected by the three or more responses of typhoon levels, 41 outdoor (half) construction sites, 6,369 comprehensive stop working sites, and 47 outdoor (half) stop work. The total number of people in the construction site was 790,304, and 536,816 people have been transferred. In addition, the construction authorities of various localities dispatched 14,149 personnel to investigate the construction of construction landlift machinery, scaffolding, sheds and other temporary facilities of 14308 construction sites. A total of 4123 hidden dangers were investigated.

In terms of urban and rural dilapidated housing, there are 928 dilapidated houses in urban and towns in the province, involving 2,993 people who should be transferred, and 2890 people have been transferred. In terms of rural houses, 4,987 hidden rural houses should be investigated. The transfer has been completed.

In addition, the province reinforced 14,7358 trees and renovated 269 advertising facilities. It has maintained inspections such as water supply, gas supply, roads and bridges, garden greening and other industries.

- END -

This round of heavy rainfall is basically over 丨 Henan has a strong response, and no dangerous situation and a large disaster situation occurred.

Henan Daily client reporter Guo Beichen intern Wu HanOn July 20, the reporter lear...

Tibet issued the "Notice" to add 600 yuan for these people!

In order to implement the spirit of the State Council and the Autonomous Region Government's notification of a policy measure for a solid and stable economy, the Ministry of Civil Affairs and the Mini...