From September 15th, the construction of new projects on the 1st Bridge of Fuxing Street and Yuhua Road!Travel → -

Author:Yan Zhao Evening News Time:2022.09.14

Fuxing Street and Yuhua Road Interchange No. 1 Bridge Demolition During the Construction of the New Project during the construction of the newly -built project

In accordance with the requirements of the municipal urban construction plan, the demolition of the newly -built project of Fuxing Street and Yutong 1 Bridge of Fuxing Street and Yuhua Road will start construction at 22:00 on September 15, 2022.

1. Construction time

From September 15, 2022 to September 15, 2023, the construction period is 12 months.

2. Construction method and traffic organization

The bridge pile foundation, Chengtai and upper structures are carried out on the connection line of Fuxing Street and Yutong 1 Bridge E ramp of Yuhua Road.During the construction period, the E ramp (Shun Fu Xing Avenue from the south to north from the west exit of Yuhua Road to the East Second Ring Ring) is prohibited from passing the motor vehicle. The motor vehicle can pass the F ramp from the east exit of Yuhua Road, at Yuhua RoadTurn around with Mount Everest Street and drive west of East China Road.

Source | Wireless Shijiazhuang client

- END -

[Town Street Time] Laoshan Town: Send the show to go to the countryside to enter the heart of Laoshan Culture to warm people's hearts

In order to welcome the 20th National Congress of the Communist Party of China, an...

Open the mysterious veil of "Mongolian" 14,000 years ago

【Technological frontier】Daily News, Kunming, July 17 (Reporter Zhang Yong) In order to unveil the mystery of the self -confidence of Homo sapiens 14,000 years ago, the Kunming Institute of Animal