Notice!From the 20th, these sections of Zhengzhou will implement night traffic control

Author:Henan Metropolis Channel Time:2022.09.16

On September 15th, the reporter learned from the Public Security Traffic Administration of the Zhengzhou Public Security Bureau that in order to accurately grasp the safety of Zhengzhou's Siqiao One Road and Jiefang Road Interchange, ensure the safety of municipal infrastructure operations, and ensure the safety of the people of the people. Zhengzhou City The Municipal Engineering Management Office plans to conduct test testing from September 20th to September 26th. The testing period is 7 days, the testing time is 0 to 5 o'clock, and normal traffic will be returned after 5 o'clock. At that time, it will affect citizens' travel. Citizens and vehicles are requested to pay attention to bypass in advance.

River Medicine Bridge: From 0:00 on September 20th to 5:00, the mouth of the Jinshui Road is closed to the south of the bridge to the south, and the vehicle detour the river doctor ground floor.

Jiefang Road Interchange Bridge: From 0:00 on September 21 to 5:00, the second floor of the closed river medicine standing bridge eastward towards the construction road ramp, the liberated road overpass to the east, the east of the Jiefang Road overpashed to the west, the vehicle is prohibited from passing by vehicles Liberation roads, vehicles detour the Jinshui Road or Zhongyuan Road.

Dashiqiao Interchange Bridge: From 0:00 on September 22 and 23 to 5, the three -layer north -south direction of Dashi Bridge is closed. The main line on the second floor of Dashiqiao is two -way and normal.

Jinshui Road stands on the second floor viaduct (Dashiqiao to Xintong Bridge): September 24th to 5:00, closed the west of the Jinshui Road to the east to the east to the upper bridge entrance (at the door of the fashion party), and the third floor of the stone bridge to the south to the south of the viaduct. East direction ramp entrance, the third floor of the big stone bridge to the north -north -level viabeling eastward ramp entrance, cultural road port, and the east of Jinshui Road to the west to the upper bridge entrance (passing the seventh road), the vehicle is prohibited from passing the second floor of the Jinshui Road. The vehicle is around the ground.

Xintong Bridge: From 0:00 on September 25 to 5:00, the west of the Jinshui Road is closed to the east to the east of the upper bridge entrance (at the entrance of the fashion party), the north -direction of the stone bridge on the southward direction of the viaduct is east of the east, and the three -layer south direction of the big stone bridge The north to the east of the east of the elevator, the east of the elevator, the ramp entrance on the cultural road, and the east to the west of the upper bridge (passing the seven roads) to the east of the Jinshui Road.

Bauhinia Mountain Interchange Bridge: From 0:00 to 5:00 on September 26th, closed the two -story ramp from the south of the Bauhinia Road to the north to north, the vehicle is prohibited from passing, and the vehicle can go around the ground.


Source: Zheng Dao Zhengzhou Daily

- END -

Optimized approval process of the Natural Resources System of the Corps

Optimized approval process of the Natural Resources System of the CorpsStrengthen service guidance and guarantee major project constructionOur newspaper Urumqi News (All Media Reporter Chen Qiong) The

Early Life | Today's Summer Solstice | The International Drifting Season of the Buddha Shadow Gorge is launched

Today is Tuesday, June 21, 2022Xiao Bu ask you wellAt 17:14 today, we ushered in t...