Shijiazhuang official announcement!The two -way 12 -lane North Third Ring is coming!

Author:Hebei Workers Daily Time:2022.09.17

This morning, the starting ceremony of the North Third Ring City of Shijiazhuang City, with a total length of 35.1 kilometers, was held. It is expected to be opened to traffic by the end of 2023.

31 connecting north -south roads

According to reports, the North Third Ring Municipalization Reconstruction Project from Shijiazhuang West Toll Station and Shijiazhuang Toll Station in the west, adhered to the concept of municipalization, attached great importance to improving municipal supporting facilities, and according to the "Yidu Road Road, Yiqiao Caidiqiao Bridge Bridge , The principle of efficient and convenient, urban integration ", transform the existing two -way 4 and 6 highways into two -way 12 -lane municipal roads. Among them, the main roads are two -way 8 -lane and auxiliary road two -way 4 lanes. The total width of the main road of the standard road is 34.5 meters. The main and auxiliary parts and 16.5 -meter auxiliary tracks are set up on both sides of the main road, including non -motorized lanes and sidewalks. There are 25 bridges, 9 interchange, 18 pairs of overlap, and 18 pairs of interchange, connecting 31 north -south existing and planning roads, including Zhonghua Avenue and Sports Avenue. Essence

Build the main and auxiliary integration, clear functions

Fast Traffic Corridor

In the specific design and construction, the main road section west of Fuxing Street will be appropriately raised to improve the problem of waterlogging in the regional cities; The 6 lanes are changed to 8 lanes, improving traffic and improving travel conditions. The auxiliary road will be set up along both sides of the main road, unidirectional, and build a fast traffic corridor with the main and auxiliary fusion and functional features, supporting the high -quality development of the South Bank of China.

Become the main road of transportation in the northern provincial capital, the urban expressway

The project is implemented in four stages in accordance with the principle of "unified design and step -by -step implementation". After the transformation, the North Third Ring Road will greatly improve the traffic environment in the area, and jointly open the urban development framework with the intersection road along the line, becoming the main traffic road and urban expressway in the northern part of the provincial capital. Stimulate the development vitality of the area, improve the living environment with high quality, improve the quality of the city, and comprehensively display the new style of the provincial capital.

Come across your phone

See the display map

■ Edit: Chen Jiaming

■ Responsible editor: Wang Shujun

■ Supervision: Li Jianhui

- END -

The Fifth Brigade of the Second Division continues to carry out joint action

In order to implement the work deployment of superiors and further increase the cr...

Dunhuang City Kindergarten: Dunhuang Culture I speak for you

In recent years, Dunhuang City Kindergarten has adhered to the purpose of laying t...