Tianshui Fire Rescue Detachment completed the 2022 firefighters recruitment inspection work

Author:Tianshui Fire Time:2022.09.17

According to the recruitment of firefighters in 2022, on the morning of September 17, the Tianshui detachment conducted a physical examination of 72 candidates entering the medical examination.

Before the medical examination, the recruitment team was familiar with and layout of the medical examination department in advance, and learned about the work process, standards, requirements, precautions, etc., clarified the work responsibilities, and made full preparations.

During the period, the dual -team officer arrived at the scene to detailed the disintegration and inspection, checked the identity information of the medical examination personnel, and emphasized that it was necessary to strictly organize, strictly check, pay attention to the team image, and maintain the order of the hospital.

During the medical examination, staff and medical staff carefully compared the information of the candidates, strengthened safety measures, strictly verified their identities, and prevented the disciplinary phenomenon of disciplinary on behalf of the exams and inspections. The physical examination is carried out in a group group. Each group is guided by two staff members to conduct physical examinations to ensure that the flow of people's flow between the inspection rooms is reasonably distributed. Medical inspectors strictly follow the national comprehensive fire rescue team firefighter recruitment of physical examination standards, seriously and responsible for various inspections for recruiters, and record the results of the inspection in detail. The medical examinations were inspected on the otolaryngus, blood routine, urine routine, electrocardiogram, chest transparency, abdominal B -ultrasound, internal (external) department and other projects for the examination of the inspectors.

At present, the physical examination work of the Tianshui Detachment of the firefighters in 2022 has been successfully completed, and the subsequent recruitment work is being carried out in an orderly manner.

- END -

Enter Shandong on the night of June 20!Before 2022, the Yellow River water adjustment and sand adjustment work began to take about 20 days.

Qilu.com · Lightning News June 19th. The reporter learned from the Shandong Provincial Department of Emergency Management today that the Yellow River water adjustment work before 2022 began on June 1

Some shopping malls in Urumqi resumed business

Video/Snapshot, T_100, F_JPG, M_fast Controls = Controls data-version/ueditor/video/mp4/20220906/16624673428399.mp4 transcoding = 1 style = width: 400px; On September 5th, in front of