Visiting Chengdu's largest bus hub complex: The "fast pace" that is familiar with the first day of the order of production and life is returned

Author:Cover news Time:2022.09.19

Cover reporter Wu Bingqing Gou Chun

From 00:00 on September 19, Chengdu will resume the order of production and living in an orderly manner, and public transportation such as bus and subway will be fully resumed.

The passenger flow of public transportation is an intuitive manifestation of urban vitality. At 10 am on the 19th, the cover journalist came to the Jinsha Bus Hub Station to visit the city's largest bus hub complex.

On the fast bus platform on the 5th floor, passengers are lining up in an orderly manner. "In fact, this morning, especially the early peak, the passenger flow has been completely restored. The frequency of our rapid buses has also returned to the state before the epidemic, so there is no long line." The city's orderly restoration of the order of production and life in an orderly manner, the fast bus line has invested the maximum capacity. The state before the epidemic. "

The familiar "fast pace" is back, but the epidemic prevention and control did not relax. The reporter saw that at the entrance of the fast bus, the staff inspected the passenger's nucleic acid report, the itinerary and measured the body temperature at the platform; at the platform, the passengers consciously lined up the vehicle according to the 1 -meter nation defined by the 1 -meter line; each vehicle was entering In front of the stations, the disinfection channels must be fully disinfected to achieve "trip to disinfect".

According to Pan Xin, the operating manager of the Chengdu Public Transport Group Passenger Transport Management Department, from 10:00 on September 15th, the Chengdu bus line has been fully restored to operation, but at the time, the "5+1" area and the "5+1" area were not across. District, but from the first bus on the 19th, all cross -regional lines have returned to normal. In addition, with the resumption of school, the peak line and home school special lines were resumed on September 19. "Since then, all our routes have been fully restored. For some lines passing through high -risk areas, we will also dynamically adjust according to the changes in the risk zone." Pan Xin said.

- END -

Leading the high -quality development of digital rural areas with standardized construction -interpretation

Xinhua News Agency, Beijing, September 2nd: Leading the high -quality development ...

The construction of the world's largest water and light complementary power plant, Yajiejiang Korova Photovoltaic Power Station, started construction

On July 8th, the first phase of the water and light complement project of the two rivers of Yazhenjiang River -Korola Photos Power Station, located in Kola Photos Power Station, located in Korola Town