Shandong Zou Ping: The hearts of the masses do a good job of water for the people's livelihood

Author:Zou Ping Rong Media Time:2022.09.20

Since the beginning of this year, under the strong leadership of the Zouping City and Water Affairs Bureau of Shandong, under the strong leadership of the Zouping Municipal Party Committee and the Municipal Government, we have closely focused on the work ideas of "11269" and conscientiously implementing the ecological protection and high -quality development strategies of the Yellow River Basin. Grasp the work, continue to improve the living environment, and provide solid water guarantee for improving the satisfaction of public services.

Water supply protection has been greatly improved. The implementation of urban and rural water supply integration projects, and a surface water plant with a daily water supply capacity of 60,000 tons, Zou Ping's water supply capacity has continued to strengthen. At the same time, strengthen water quality testing, invest 200,000 yuan to install the water quality online monitoring system, and monitor real -time water out of factory water in 24 hours. Complete 106 items per year, 8 items per day, and 42 water quality tests per quarter to ensure water supply safety. The implementation of rural water supply guarantee capacity improvement projects will be renewed by 2023 to complete the renewal and transformation of 276 pipeline networks. Reform and strive to achieve full coverage of large -scale water supply. At present, the water supply pipe network in 169 villages has been completed, the safety of water supply has been effectively guaranteed, and the satisfaction of the masses has been significantly improved.

The water ecological environment is effectively consolidated. Always maintain water ecological rectification, strengthen daily investigation, and realize the dynamic clearing of black and odorous water bodies in the construction of the city. The implementation of the bidding and transformation of the Zouping Urban Sewage Treatment Plant, the quality of the water outlet will be raised to the standard IV water body quality standard, the sewage is turned into water and good water, and the resource use is gradually realized. For the comprehensive governance of soil and water conservation in the family of the family river beach, Xiyu Village Tangba, Baiyunlun, Yangjiayu, and Zhengjiatangba, the city's living goals of "water clearing, riverburst, shore green, Jingmei, and Yiyi" are gradually becoming reality.

The drainage function continues to improve. Strengthen the reconstruction of rain and sewageframe pipelines and continuously improve the living environment of residents. The 113 old communities planned to be transformed in 2022 have completed 105, and all of the remaining 206 old communities, enterprises and institutions have been prepared for on -site surveys and research reports, and strive to achieve rain and sewage bleeding pipe network clearly by 2023. Strengthen the inspection and maintenance of the drainage pipe network, conduct a comprehensive investigation of the municipal sewage pipe network of the completion area, and investigate a total of 228 kilometers of municipal sewage pipe network in the area, 92%of the inspection completion rate, and rectified the problems found in the investigation as soon as possible. Implement the sewage pipe network dredging and dredging, a total of 4.3 kilometers of dredging pipes, and cleaning more than 2,500 cubs. The urban flood prevention and drainage functions have been effectively guaranteed. The happy home of the home lays a solid foundation.

Correspondent Chen Zhenjuan reported

- END -

About the notice of rural rejuvenation special, local superior teachers, and provincial public funding students' undergraduate colleges and universities colleges and universities solicit volunteer notice

川 Source of this article: Sichuan Education Examination Institute-NickName = Sich...

Hefei set off!Shorten 40 minutes!

Recently, He (Fei) (Fei) (Fei) (Yang) (Yang) high -speed Lu Ting South Hub to Fushan Interchange (Puyang North) has successfully passed the work acceptance, marking that the section has the conditions